Laserfiche WebLink
TABLE 2-1 <br />TRIP GENERATION FOR <br />ROSEWOOD CORPORATE <br />CENTER <br />Ref: ITE Trip Generation 1982 <br />BUILDING <br />Gross SF <br />RATE RATE <br />ADT RATL AM IN <br />RATE <br />RATE <br />- <br />-------- <br />-------- <br />AM <br />OUT <br />PM IN <br />PM OUT <br />BLDG #1 <br />BLDG #2 <br />60500 <br />75000 <br />-------- <br />16.9 <br />-------- <br />2•04' <br />0. 35 <br />-------- <br />0.38 <br />--- - ..__ <br />2.31 <br />BLDG #3 <br />125000 <br />16.2 <br />14'3 <br />'=95 <br />0.34 <br />0.3"t <br />2.21 <br />BLDG4 <br />162000 <br />13.5 <br />1.79 <br />1.69 <br />0.21 <br />0.41 <br />1.62 <br />BLDG #5 <br />190250 <br />13.1 <br />1.64 <br />0.2 <br />0.38 <br />1.53 <br />0.19 <br />0.37 <br />1.49 <br />TOTALS <br />612750 <br />PREDICTED TRIP GENERATION VOLUMES <br />(ADT) <br />---- <br />(AM IN) <br />(AM OUT) <br />(PM IN) <br />(PM OUT) <br />-- <br />1022 <br />-------- <br />123 <br />-------- <br />-------- <br />1215 <br />146 <br />21 <br />26 <br />23--- <br />28 <br />140 <br />1788 <br />2187 <br />224 <br />26 <br />51 <br />166 <br />203 <br />2492 <br />274 <br />312 <br />32 <br />36 <br />61 <br />248 <br />70 <br />283 <br />8704 <br />1079 <br />141 <br />234 <br />1040 <br />