Laserfiche WebLink
November 7, 1984 <br />City of Roseville <br />Loehmann's Plaza <br />Page 4 <br />4. Parking Lot, Paving, Curb and Gutter <br />It is estimated that approximately 33,500 square yards of automobile area <br />paving and 6,900 square yards of truck area paving will be required on <br />the site. It is estimated that the paving and aggregate base for the <br />parking lots and driveways will cost $384,000. In addition to this <br />paving, there will be approximately 7,000 linear feet of concrete curb <br />and gutter at an estimated cost of $38,000. <br />Included in the plans is sidewalk along Fairview*Avenue for the entire <br />frontage. It is estimated that approximately 350 square yards of sidewalk <br />will be constructed at a cost of $3,200. <br />To summarize, the costs for development are as follows: <br />A. Preparation of Site: <br />1. Removal of Existing Houses and Other Structures <br />2. Removal of Existing Sanitary Sewer, Watermains, <br />Storm Sewers, Gas Lines, Telephone Lines, and <br />Electric Lines <br />3. Removal and Disposal of Existing Bituminous Pavement <br />4. Grading and Soils Correction <br />Subtotal <br />B. Improvements <br />1. Retaining Wall for Storm Sewer Pond <br />2. Curb Cuts, Median Cuts, and Driveway Entrances <br />3.* Sanitary Sewers, Watermains, and Storm Sewers <br />4. Parking Lot Paving, Curb and Gutter, and Sidewalk <br />Subtotal <br />$ 110,000.00 <br />30,000.00 <br />3,000.00 <br />272,000.00 <br />$ 415,000.00 <br />$ 63,000.00 <br />19,500.00 <br />197,500.00 <br />425,200.00 <br />$ 705,200.00 <br />Total $1,120,200.00 <br />In our review of the above cost items, the following are identified as cost <br />items not usually associated with development of a "typical" commercial site: <br />1. Removal of Existing Houses and Other Structures <br />2. Removal of Extensive Utilities Systems <br />3. Removal and Disposal of Existing Street Surfacing <br />4. Extensive Site Grading and Soils Correction <br />5. Retaining Wall at Storm Sewer Pond <br />6. Oversizing of Watermain System <br />Total <br />$ 110,000.00 <br />30,000.00 <br />3,000.00 <br />272,000.00 <br />63,000.00 <br />8,000.00 <br />$ 3869000.00 <br />