My WebLink
|
Help
|
About
|
Sign Out
Home
pf_01575
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF1000 - PF1999
>
1500-1599
>
pf_01575
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2024 10:27:18 AM
Creation date
2/20/2024 10:25:39 AM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
1569
Planning Files - Type
Rezoning
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MLmorandum to File <br />Page Three <br />March 5, 1985 <br />Comm. No. 84-01-0031-01 <br />17. Bill Nichols indicated to proceed with the plan received from Loehmann's <br />regarding this store. We will receive, in addition, a reflected ceiling <br />plan and interior elevations. Bill Nichols will verify the conveyor <br />system intended to be used in the store. KKE indicated that the <br />presently shown roof c-.uttle access would not be acceptable to the <br />Building Inspection De�,artment. It was also noted that the Women's <br />Toilet Room was not accessible to the handicapped. A one foot wide space <br />needs to be provided south of Door Number 14. <br />18. The pylon signs were briefly discussed. The City has reviewed their lo- <br />cations and indicated that they need to occur beyond the required set- <br />back. <br />19. Gary Newhouse indicated that he has contacted sign companies regarding <br />leasing the signs. Further information will be provided as it is <br />available. <br />20. Architecturally, the exterior elevation presented was acceptable. Dryvit <br />was discussed as a potentially useful material for the interior and <br />exterior of the pavilions as well as the accent stripe on the masonry <br />walls. The Owner concurred with this selection. It was agreed the lower <br />8' of the interior and exterior surfaces would be reinforced with a <br />double layer of mesh. <br />21. The ceiling of the pavilions were agreed to be configured in a series of <br />stepped coffers. This simplifies the roof construction and gives these <br />areas a very crisp appearance. Special lighting should include some <br />uplights. <br />22. The Owner will check on the door manufacturer for the overhead doors used <br />on the Toronto project for possible inclusion in this project. KKE also <br />suggested a new overhead door type but did not have a contact yet. <br />23. The Owner suggested that the skylights along the sloping roof portion of <br />the wall be as flush as possible with the outer roofing material. KKE <br />will investigate. <br />24. The permanent main doors at each pavilion need to be fixed in an open <br />position when the overhead doors are used in their open position. KKE <br />will investigate. <br />25. We agreed that the use of an integral color in the concrete walkway <br />including the use of scoring would achieve a more distinctive appearance <br />for the floor surfaces. It was agreed that no additional lease space is <br />to be developed on the lower level near or under the entrance bridge. <br />26. KKE is to develop a scheme for exiting to the north through the <br />presently designated storage area on the lower level. The storage area <br />is to be lowered to the adjacent (Lease Space 24) floor elevation. <br />27. KKE is to call Williams Pipe Line regarding the required information. <br />
The URL can be used to link to this page
Your browser does not support the video tag.