Laserfiche WebLink
Memorandum to File <br />Page Two <br />March 5, 1985 <br />Comm. No, 84-01-0031-01 <br />7. T,G.I.F. - Drawings have been sent* Dallas. T.G.I,F, would like a com'letedenadybwaiting for a response from <br />requirement is to be incorporated into the construction 1ocu This <br />(4) parking lot fixtures are to operate in con•unc documents. Four <br />Nelson-Rudie is to incorporate the necessary meters <br />and Tanurb will � � ton with T.G,I.F, <br />weeks. Provide the required information within the next four <br />(4) <br />8. Nelson-Rudie will look at the back of the center <br />lighting: <br />a. On the building or <br />b• On Pole mounts at the north property line facing <br />9• Nelson-Rudie &Associates issued their the building. <br />electrical design criteria (dated Februareliminary mechanical and <br />is to review and comment on specific items. <br />28� 1985)� for review. Tanurb <br />10. Scott Rudie needs an approved tenant lease drawing <br />11. Rooftop units at some locations require wing as soon as possible. <br />create visually disturbing elements onethe rroofline mustiber made. <br />not to <br />will explore design alternatives, be made, KKE <br />12. Duct chases through Loehmann's space are to be <br />will evaluate the HVAC requirements for the lower olevel Nelson -Rudie <br />locate any duct chases which may be required to ass h tenants and <br />level tenant spaces. A method for mall ventilation through the upper <br />uated, will also be eval- <br />uated. Nelson-Rudie is to incorporate four (4) ad m <br />transformer needs a room for switch earp punted transformers; each <br />and location of service rooms and inform KKEIeCMechanitrical will determine size <br />water and gas service rooms also, cal will locate <br />14. A copy of the February 26, 1985, memo regarding <br />Of the project with the City of Roseville was reviews meeting and review <br />apparent problems with the present approach. NelsoneRudiehere are no <br />87 Associates <br />are to prepare their calculations to meet the Energy <br />15. Dennis Nelson obtained a co Code, <br />soil <br />anon of the information obtainedtincludinrea <br />bnrt. He will make an evalu- <br />structural bays and conditions for review analysis of the typical <br />y KKE. <br />16. KKE received a set of specifications for Children's <br />revise the back of Children's Palace to accommodate ialace, <br />enclosed truck loading area, a staging area and KKE is to <br />mall entrance was omitted to Children's Palace covered and <br />to convince the Owners that a direct a dumpsrli location. The <br />Tom Ehrlich will attempt <br />desirable. KKE is to connection to the mall would be <br />present the signage for Children's Palace for <br />approval by the City of Roseville. <br />KKE is also to review a proposed <br />location for parcel <br />Pickup with the City, <br />