Laserfiche WebLink
''The Fourth Generation <br />McGough Construction Co., Inc. of Craftsman Guilders" <br />tD <br />2737 Fairview Avenue North <br />StTaul, Minnesota 55113-1372 <br />(612) 633-5050 Fax (612) 633-5673 <br />January 2, 1991 <br />Mr. Robert Rosenquist <br />City of Roseville <br />2660 Civic Center Drive <br />Roseville, MN 55113 <br />Reference: Rosedale Renovation - Phase I <br />Dear MY. Rosenquist: <br />Inc. is currently doing renovation <br />McGough Construction Co., us <br />work at Rosedale Shopping Center. Inforder us torunan complete <br />this renovation is will be necessary the first <br />compressor and a crane outside of the tonl2rweeks�ning <br />week of February for approximately 10 <br />d the city has an ordnance that this equipmentomcdouot <br />We understand Y <br />be operated before 7:00 a.m. We woo a 1100 aemllforothis 12yweek <br />to start operation of the equip project on a <br />period in order for us to be able to complete this <br />timely basis. <br />lease understand that the operation of the craaemorto°7p00saom. <br />P periodic from 1:00 <br />will not be continuous, but port on <br />At <br />tached is a copy of American Engineering Testdecibelepeadings <br />sound level monitoring which provides you with <br />of our crane in operation. <br />If you need any additional information or have any questions, <br />lease contact me. Your favorable consideration in this matter <br />p appreciated. <br />will be greatly <br />Sincerely, <br />McGOUGH CONSTRUCTION CO., INC. <br />Doug Geor c, <br />DG/csl <br />Encloslzre <br />An Equal Opportunity Contractor <br />