TCC Center Companies, Case No. 1937 <br />Page 3 <br />southeast is access by a ramp on the east side. This portion of <br />the parking ramp is at the second level and the lower, level will <br />be at grade (the way it is now west of Ward's). <br />e) Landscaping: A Landscape Concept Plan has been submitted <br />indicated a substantial improvernent in landscaping on the site. A <br />series of islands winlbe side of constructed <br />peripheral ed of the r adsystem. parking These <br />bays defining the <br />will be curbed, irrigated, and planted with a pair of deciduous <br />trees. Additional landscapaees 1 to pthe ropostrducture. th Approval cof <br />es <br />throughout the site and entn <br />the final Landscape Plan should be conditional to approval of the <br />Development Plan. <br />f) Building Materials, Exterior Elevations f } the dstrugtures haRedve beed <br />drawings of the exterior elevation o <br />submitted and specific details of at thematerials hearings.are The t applicants <br />though, they should be discussed <br />have indicated that the new parking ramp will be surfaced with <br />an applied granular texture similar to at Thenew which is Dayton's <br />being used for the expansion at Southdale <br />store is being designed by a separate architectural firm employed <br />by the Center Companies. Those plans are in progress and <br />details of the building materials are not known. <br />Obviously, the object should be for all of the materials to be <br />complimentary to one another. Each of the major structures in <br />the existing Rosedale center are of different material, though <br />harmonious as a whole. Additional inquiry regarding the Dayton's <br />store material at the hearing would seem to be appropriate. <br />Exterior signage on the building is noted on the exterior <br />elevations. There has been no submission for any change in pylon <br />signage, so we are assuming that it will remain the same. <br />Rooftop Equipment <br />and Trash Handling: <br />The Development <br />Plans <br />g) <br />as prepared <br />do not sufficient detail <br />to illustrate the <br />exact <br />handling of the trash facilities for the old and the new Dayton's. <br />It would seem <br />appropriate to require that <br />these be internal. <br />This <br />has not been <br />a problem with the center <br />as it exists and <br />should <br />not be so in <br />the future. <br />The screening of rooftop equipment should be provided by a <br />parapet and/or location near the center of the structures so as to <br />inhibit eye level vision. This detail is not delineated in the plans <br />as submitted, but should be discussed at the Public Hearing and a <br />condition considered to ensure the screening of such rooftop <br />equipment. <br />h) Fir . e Marshall Consideration: During the process of reviewing <br />preliminary plans with the applicants, the Fire Marshall has been <br />consulted. Thu principle access driveq for the second level of the <br />parking deck are to be constructed so as to handle the weight <br />and scale of a fire truck. Likewise, the clearance under the <br />second level deck will be 14 feet (the same as freeway bridges) <br />to provide adequate clearance. You will notice from the <br />