My WebLink
|
Help
|
About
|
Sign Out
Home
pf_01909
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF1000 - PF1999
>
1900-1999
>
pf_01909
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 8:44:41 AM
Creation date
2/21/2024 8:38:55 AM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
1909
Planning Files - Type
Special Use Permit
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />Chris Seigle <br />November 30, 1988 <br />Page 2 <br />'ect's traffic impacts have also been analyzed t the <br />intersections <br />o The prod bound and westbound ramps <br />of Lexington Avenue and the TH 36 east <br />• 0 PM to 5:30 PM ng the <br />peak hour. These two intersectionbeare <br />expectednto cause <br />con- <br />4:3 and the project would <br />sidered to operate adequately, <br />one to two percent increase in traffic. No roadway improvements are <br />only a <br />considered necessary at these two intersections. <br />i� <br />o The construction of the project site will preclude thegton A. spossibiyimprovement <br />extending Lovell Avenue w.y tooserve ntrafficenuedemands in the area. <br />is not considered ,ecessa <br />� afore this i� not considered to be an issue in the traffic impact ana- <br />Sher <br />lysis of the project. <br />DATA UTILIZED IN THE TRAFFIC ANALYSIS <br />The following win data was used in the traffic impact analysis described in this <br />memorandum: <br />o Existing <br />traffic counts conducted by BRW at the intersecerjndsffrom17g00nAM <br />Avenue and the project access drivedway30u�©n5:3Qthe <br />PMtime p <br />to 9:00 AM, 1:00 PM to 3:00 PM, an <br />o Existing <br />traffic counts conducted by BRW at the intersections <br />timeeper9od`� <br />Avenue and tha TH 36 eastbound and westbound ramps during <br />from 4. <br />•30 PM to 5:30 PM. <br />o Info <br />rmation provided by the Minneapolis Business College on the existing <br />traffic characteristics of -he college. <br />o In <br />formation provided by the Minneapolis Business College e.l the origins <br />(i.e. residence locations) of students of the college. <br />o Information regarding the existing street system gathered by BRW. <br />o The project site plan as provided by KKE Architects. <br />The us <br />e of this information 1s further discussed in the sections which follow. <br />ASSUMPTIONS UTILIZED IN THE TRAFFIC ANALYSIS <br />The following assumptions were utilized in the traffic impact analysis: <br />o Assumptions regarding the traffic generation of <br />he protect based he <br />on on the <br />project site plan, information published y t <br />ation <br />Engineers, and information received from the Minneapolis Business College. <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.