Laserfiche WebLink
Chris Seigle <br />November 30, 1988 <br />Page 3 <br />n Assumptions regarding the directional orientation of traffic which is <br />generated by the project. <br />The use of this information is further discussed in the sections which follow. <br />TRAFFIC GENERATION <br />The t generation. eneration. of the project was considered in terms of the peak tout- <br />raf- <br />fic hour on Lexington �`',enue, (4:30 PM to 5:30 PM) and the peak inbound and00 PM <br />bound traffic generation periods of the project (7:30 AMoto 8:00 <br />ese M an periods to 2:30 PM, respectively.) Tra fic generation for <br />described below. <br />The estimated traffic generaticn of the project for the 4:3PMP to 5:30hour trips are <br />period is shown in Exh <br />ibit 3. A total of 769 daily nd 68expected to occur at the project site at full development.wellaffitraeneratiofficnts <br />was based on analysis of the project s characteristics <br />of similar facilities published by the Institute of Transportation Engineers <br />(Trip Generation, 4th Edition, Institute of Transportation Engin ) <br />The traffic generation estimates were intended to besomewhat <br />ot oconservative in <br />order to ensure that any potential traffic problems were <br />Traffic generation for the college was based on ITE studenuntsofts and ssmalltaff mcolleges.embers.It <br />The trip 3eneratlon rate inc.udes trips made by <br />P <br />also includes the assumption that students living on -site will walk to the <br />school. The peak periods of traffic generation for the college are expected to <br />occul"I at 7:30 AM to 8:00 AM and 2:00 PM to 2:30 pM PM. <br />traffic,PM peak typicalhyu4:30oto <br />in Ex►sibit 3 is the PM peak hour of adjacent street <br />5:30 PM. <br />Traffic generation for the residential units was based on ITE counts of <br />multiple -family residential dep velo ments, according to the number of parking <br />spaces provided. It is expected that each unit will accommodate eight students. <br />Since this is not a typoc�1at�vtogbaseathement for traffic generation on the number of <br />as not considered appropriate f the <br />w i Parking spaces were used as the basis o <br />units or the number of residents. <br />traffic 9nneration, since it would be reasonable to <br />other assume <br />that <br />vehicles used vehicles <br />owned by residents would be used about as of as <br />onsidered to be a conserva�:ive <br />Multiple -family housing residents. This is c <br />assumption, since residents could walk to and from the school to attend classes. <br />Traffic generati <br />on for the 7:30 AM to 8:00 AM and 2:00 PM to 2:30 PM periods was <br />based on the existing traffic generation characteristics of the Minneapolis <br />Business College as provided by the college e to BRW. between 7A total <br />laof 9800ehicless <br />would be expected to enter the project site between 2:00 PM <br />total of 82 vehicles would be expected to leave the project site <br />and 2:30 PM. <br />1 <br />