Laserfiche WebLink
Planning office <br />Howard Dahl Hours <br />April 13 9ren <br />. 1988 <br />2. <br />3. <br />4. <br />N" 5 <br />Page # 4 <br />Of the structure <br />• Larson, so as tO prevent <br />The retainin property. <br />Rekuski,s g wall, built on <br />will be stperOperty from the struct a east side of <br />ft, walls, peed back and reduced fry toward the lake <br />• <br />treatedthus <br />ember not re m 4 ft . to two 2 <br />t' quiring a fence. <br />material, and This <br />will be rebuilt with wall is <br />All the the same <br />Larsonis yard work, including <br />with grass will the repair to <br />an agreed completed Mr. <br />Mr. Rekuski and up°n landscape y May 6 In <br />that reviewed plan to accordance <br />he will add 6 with Mr be prepared b <br />east of Larson It is <br />the side his garage.Yamidal evergreen agreed <br />trees along <br />The damage <br />re done to paired, whichMr, Larso e <br />metal strip addeapparently includes garage will <br />garage, near the replacement be <br />northwest corner of a <br />6• The da of the <br />7. <br />L-IM <br />The roof runoff <br />would be managedon the east <br />the runoff with new do side <br />from going on Mr wnspouts <br />theomplto Mr.i Qge <br />hed by Mr R Larson 1 s dr . <br />entire Rekuski y. lveway will <br />Larson• driveway, which pa ing for the b e <br />will be installealer for <br />There will ed by Mr• <br />servi.Ce be a new under <br />Rekus constructed from ground power <br />ki s lot, replacin the southwest and telephone <br />exists which affects i g the overhead corner of Mr. <br />Larsonrs service that o <br />r. Reskuskilproperty, now <br />driveway, s new garage <br />from the ethe new drivewthree foot higher <br />will Property line aY will be than the <br />be landscaped as Will set back 5 ft. <br />Plan to b,, Ped in accordance and the transitio <br />Prepared and agreed upon. the the landscape <br />It was further <br />builtsse threeelatingr to that <br />thea new minor variance <br />feet setback setback approved from the Property Of the home will be <br />Will then for the line, the which was <br />application• be reprocessedarage• This same as the <br />as a revised site plan <br />these two felIt s hoped that the Shoreline <br />result in will settle agreement development <br />basis no further di joint on the part of <br />develo Mr, Larson noted between COncerns, and <br />pment as now proposed that he does not the <br />two.on this <br />t to the <br />