My WebLink
|
Help
|
About
|
Sign Out
Home
pf_01884
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF1000 - PF1999
>
1800-1899
>
pf_01884
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 9:51:59 AM
Creation date
2/21/2024 9:50:06 AM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
1884
Planning Files - Type
Variance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
mom <br />GENERAL OUTLINE SPECIFICATIONS <br />BUTLER PAPER COMPANY <br />ROSEVILLE, MINNESOTA <br />A. GENERAL <br />lj <br />1. THE FACILITY IS LOCATED AT 3080 LONG LAKE ROAD, ROSEVILLE, <br />MINNESOTA. <br />2. THE PRELIMINARY BUILDING PLAN AND GENERAL OUTLINE SPECIFICATIONS <br />SET THE STANDARD FOR ALL BUILDING AND COST DATA TO BE USED IN <br />CONJUNCTION WITH THIS PROPOSAL, ANY DEVIATIONS FROM THESE SPECI- <br />FICATIONS, INCLUDING SUBSTITUTIONS OR ALTERNATIVE OPTIONS, MUST <br />BE FULLY DESCRIBED AND COST DIFFERENTIALS, IF ANY, FROM THE ORIG- <br />INAL SPECIFICATIONS SO NOTED. <br />3. ARCHITECTURAL AND ENGINEERING :,ERVICES WILL BE PROVIDED BY THE <br />GENERAL CONTRACTOR, INCLUDING BUILDING SPECIFICATIONS, WORKING <br />DRAWINGS AND SHOP DRAWINGS. <br />4. PERMITS, LICENSES AND ALL OTHER FEES RELATED TO THE BUILDING = <br />PROJECT WILL BE SECURED AND PAID FOR BY THE GENERAL CONTRACTOR. <br />5. ALL MATERIALS USED AND WORK PERFORMED WILL BE IN ACCORDANCE WITH <br />GOOD,.ESTABLISHED BUILDING PRACTICE AND IN COMPLIANCE WITH ALL <br />GOVERNING U.B.C, U.F.C., O.S.H.A., STATE AND LOCAL ZONING, <br />COVENANTS AND/OR BUILDING CODES. <br />6. BUTLER PAPER COMPANY WILL SECURE THE NECESSARY INSURANCE <br />COVERING FIRE, WINDSTORM AND OTHER DIRECT LOSS DURING THE COURSE <br />OF CONSTRUCTION TO INCLUDE MATERIAL ON SITE PROVIDED BY THE <br />GENERAL CONTRACTOR. <br />7. THE GENERAL CONTRACTOR WILL SECURE WORKMEN'S COMPENSATION AND <br />LIABILITY INSURANCE, COMPREHENSIVE LIABILITY INSURANCE AND COM- <br />PREHENSIVE AUTOMOBILE LIABILITY INSURANCE. CERTIFICATION OF IN- <br />SURANCE COVERAGE WILL BE FURNISHED TO BUTLER PAPER COMPANY. <br />8. ALL MATERIALS USED AND WORK PERFORMED WILL BE GUARANTEED BY THE <br />GENERAL CONTRACTOR FOR A PERIOD OF ONE YEAR FROM THE DATE OF <br />BUILDING ACCEPTANCE BY BUTLER PAPER COMPANY. <br />S. TIME STANDARD A.I.A. CONTRACT IS THE PREFERRED DOCUMENT FOR CON- <br />STRUCTION AGREEMENT; HOWEVER, THE GENERAL'CONTRACTOR MAY SUBMIT A <br />(BLANK) CONTRACT FORM, REPRESENTATIVE OF THE TYPE NORMALLY USED BY <br />HIM FOR NEW BUILDING CONSTRUCTION, FOR PRELIMINARY REVIEW BY <br />BUTLER PAPER COMPANY. <br />Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.