5. DRAINAGE WORK, IF SPECIFIED IN <br />QUIRED TO COMPLY WITH EXISTING <br />THE GENERAL CONTRACTOR. <br />6. <br />1. <br />THE SOIL TEST REPORT AND AS RE - <br />REGULATIONS WILL BE PERFORMED BY <br />LANDSCAPING IF ANY, WILL BE IN ACCORDANCE WITH ANY REQUIRED <br />COVENANTS. A FLAT $5,000 ALLOWANCE MAY BE USED, IF DESIRED, AS <br />PART OF THE TURN -KEY BUILDING ESTIMATE. <br />TIME TRUCK AREA WILL BE SUITABLY PAVED (WITH 3"/8" CONCRETE <br />RECOMMENDED) OR ALTERNATE SUITABLE FOR CLIMATIC AND SOIL <br />CONDITIONS. A CONCRETE APRON 60' LONG WILL BE POURED AT THE <br />ADDITIONAL THREE (3) TRUCK DOCKS. A CONCRETE DRIVE -UP RAMP WILL BE <br />CONSTRUCTED, ACCESSING THE DELIVERY DOCKS. <br />8. CONCRETE SIDEWALKS AND STEPS WILL BE INSTALLED WHERE REQUIRED. <br />9. PARKING AND TRAFFIC LANE STRIPING WILL BE PAINTED ON THE PAVEMENT, <br />AS REQUIRED. <br />10. BUMPER CURBS WILL BE INSTALLED Ar EACH PARKING STALL. <br />Page 2 <br />