Laserfiche WebLink
J. HEATING AND AIR CONDITIONING <br />1.- <br />THE FORCED AIR, DUCTED HEATING AND COOLING SYSTEM WILL BE MODIFIED' <br />TO CONFORM WITH THE OFFICE AND LUNCHROOM CHANGES. ENSURE SUFFICENT <br />CAPACITY TO MAINTAIN COMFORT STANDARDS <br />CONDITIONS. <br />NECESSARY FOR CLIMATIC <br />2. <br />POSITIVE PRESSURE HEATING SYSTEM (CAMBRIDGE <br />OR EQUIVALENT) WILL BE <br />INSTALLED. IN THE WAREHOUSE OF SUFFICIENT <br />SIZE ANDTO <br />MAINTAIN A TEMPERATURE OF 55 DEGREES FAHRENHEIT. <br />.QUANTITIES <br />3. <br />POWER EXHAUST SYSTEMS WILL BE INSTALLED IN <br />CHARGING AREA IF REQUIRED BY CODE. <br />THE WAREHOUSE BATTERY <br />4. <br />AIR VENTS, EITHER POWERED OR GRAVITY TYPE <br />x' <br />(SPECIFY) SMOKE VENTS <br />AND/OR DRAFT CURTAINS WILL BE INSTALLED IN <br />THE WAREHOUSE ROOF IF <br />REQUIRED BY BUILDING CODES. <br />Page 10 <br />