Laserfiche WebLink
From: R1.ck Boran Target Construction <br />Date: 8/3/88 <br />Subject: Storage Tent <br />At this time we are undergoing a major .remodel of the <br />Target store at County Road B. on August 15 we will start <br />building new st-)re fixtures inside the store. I need storage <br />facilities to stage the new fixtures. This could be accomplished <br />in one of two ways,storage trailers which would take 20 to 30 <br />fourty foot trailers or one tent that would be 40" X 80'. We <br />would perfer to set up a tent as this would confine us to a <br />smaller area and would look much better to the Public. The time <br />frame for this construction is August 15 -to October 31. At that <br />time we would have the tent down and would begin the landscaping <br />on the north end of the store. Attached please find a sketch <br />with the proposed location of the tent. <br />eS'ncel <br />Rick Boran <br />