Laserfiche WebLink
r <br />I <br />I <br />�i <br />II <br />1)ac e 118G <br />November 20, 1979 <br />from staff, there is actually 200.95 feet of frontage on the <br />entire 1>,ircel of hrol,(:rty, and Further stated that the equal <br />lot division would actually allow property setbacks. He <br />aAr <br />suggested that the action approving the setback variance <br />should be rescinded, that there is no longer a need for <br />variance. Mr. Y,Ickel stated that he still wants the ten <br />foot variances:. Councilman 1-1(--rt-(!n:;oLLo C(:lt the variance <br />which had been approved should be rescinded at this time and <br />that a request should be made, if desired, when a structure <br />is planned. <br />Councilman Mertensotto asked Mrs. Bradt whether she plans to <br />do all of the repairs at one time or do some of the repairs <br />and let the rest wait. She responded that their plan is to <br />1" do only the heating and sewer and water extensions now. Mr. <br />` Bradt stated that next spring a new roof would be put on and <br />other repairs would be done. Councilman Mertensotto <br />suggested that the Council acquire some type of guarantee, <br />from the Bradt's that the updating will be done. <br />Mrs. Bradt stated that they want to update the house, and sh <br />realized that she needs to give the City some kind of <br />guarantee. She was concerned, however, that if a substanti4 <br />amount of money is 1)ut into an escrow account she will not <br />have funds available to do the work. She stated that she <br />has contracted for the sewer and water extensions at the prc <br />sent time, and that a contractor has been hired to reroof <br />the home in the spring and another contractor to do siding <br />and insulation in the spring. <br />Councilman Mertensotto suggested that the Council require a: <br />escrow deposit which could remain with the City if the <br />building permit is not completed within a specified time <br />frame. when asked what the anticipated completion time is, <br />Mr. Bradt stated that they anticipate completion in 26 <br />months with the exception of the garage. Mrs. Bradt stated <br />that although the Code Enforcement Officer indicated new <br />siding should be required, she did not feel that new sidinc: <br />was necessary. <br />After further. discussion, Councilman Mertensotto moved to <br />amend the original Council action approving the division <br />Lot 1, Vandall's Outiots into a lot of 100 feet frontage, <br />and a lot of 100.95 feet of frontage, and rescipding the <br />ten foot sideyard setback variance. <br />Ayes: 5 Councilman Hartmann seconded the motion. <br />Nays: 0 <br />COMPREHENSIVE LAND <br />USE PLAN <br />The City Planner, Howard Dahlgren, and several Planning <br />Commission members were present to discuss the proposed <br />Comprehensive Land Use Plan. Mayor. Lockwood stated that <br />the November 13th special meeting the Council had discuss, <br />the proposed Comprehensive Land Use Plan and its distri.bu <br />tion, and the action relative to distribution resulted in <br />a split vote. Mayor Lockwood stated that the 3-2 vote on <br />November 13th was the result of, proposed zoning changes f <br />