My WebLink
|
Help
|
About
|
Sign Out
Home
pf_01682
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF1000 - PF1999
>
1600-1699
>
pf_01682
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 1:59:59 PM
Creation date
2/21/2024 1:59:39 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
1682
Planning Files - Type
Special Use Permit
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />Korsunsky Krank Erickson Architects, Inc. <br />300 First Avenue North <br />Suite 500 <br />Minneapolis, MN 55401 <br />612/339-4200 <br />SUMMARY SCOPE OF WORK JULY 2, 1986 <br />J. R. JOHNSON SUPPLY ADDITION <br />ROSEVILLE, MN <br />COMM. NO. 86-01-3020-01 <br />INTRODUCTION <br />J. R. Johnson Supply is a wholesale supplier of floral and landscape products <br />for retail outlets. The company has be;:n located on Long Lake Road for 14 <br />years taking over a structure originally built as a precast concrete <br />manufacturing plant. Growth has occurred over the years with expansion taking <br />place as required. A greenhouse, warehouse space, and a plastics manufacturing <br />facility have been added to the original building creating a variety of <br />architectural expressions in addition to the original concrete building. <br />PROGRAM <br />J. R. Johnson plans to undertake a complete modernization of their facility <br />replacing outdated greenhouses and storage_.facilities. This renovation of the <br />existing facility will provide a unified architectural appearance for the <br />entire structure and update the site and landscaping to the current city <br />standards. This work will be accomplished in a three phase program that is <br />outlined below: <br />Phase 1 - 1986 - 1987 <br />A. Site Work <br />1. Redesign of the parking lot and service area. All driving surfaces <br />will be upgraded with curbing and pavement. <br />2. Site utilities and drainage will be upgraded to current standards. <br />3. Relandscaping of the entire site to current standards. <br />4. Painting of the existing floral and plastic manufacturing building. <br />
The URL can be used to link to this page
Your browser does not support the video tag.