Laserfiche WebLink
Page 2 <br />J. R. Johnson Supply <br />Summary of Scope of Work <br />July 2, 1986 <br />B. Building Demolition and Construction <br />1. Removal of two thirds of the temporary greenhouse at the southeast <br />corner and replace with a warehouse buildng. The exterior will be <br />precast concrete wall panels with an aggregate finish. <br />Phase II - 1987 - 1988 <br />A. Greenhouse Construction <br />1. Extend existing greenhouse. <br />2. Add new greenhouse in front of existing greenhouse. <br />B. Building Construction <br />1. Add enclosed garage addition to floral distribution building. <br />2. Refinish Belden plastic garage (existing cons. block will have an <br />aggregate finish to match the precast concrete wall panels. <br />Phase III - 1988-1989 <br />A. Building Construction <br />1. Build enclosed loading dock addition. Construction will be precast <br />concrete panels with an aggregate finish. <br />2. Add 2nd warehouse addition. Construction will be precast concrete <br />panels with an aggregate finish. <br />3. Add cooler addition to floral building. It will be construction in <br />same metal wall panel system as the north warehouse for Belden plastic <br />manufacturing building. <br />me r <br />