Laserfiche WebLink
METROPOLITAN METALS RECOVERY AND PROCESSING FACILITY <br />EAW Errata Sheet <br />Page 3a, Item 21 - Re lace the first paragraph with: <br />The only construction which will affect surface water quality on -site wil <br />consist of installation of a seconds 1 <br />system for 1- <br />accidental spills and leaks. This nstructioneactivity wouldwhavrol of <br />e an <br />insignificant effect on surface water quality in the area. Most constry <br />will take place within the existing warehouse buildingction <br />stallation of separators, vats, tanks and containmentsystems)lling and in - <br />The project will also be subject to requirements for transporting toxic or <br />hazardous wastes under the Toxic Substances Control Act (TSCA) and the <br />Resource Conservation and Recovery fact (RCRA), respectively. <br />Page 3a, Item 72 - Replace the second <br />Paragraph with : <br />It has to be determined if Environmental Protection Agency (EPA) wastewater <br />Pretreatment regulations apply to central processing recovery facilities <br />such as the proposed facility and if the do <br />The MPCA will solicit a letter from they apply' to what. extent they apply. <br />the review the Project, and the EPA will determine eif the �federal PCA dcat® cathe tegorical <br />will <br />regulations for electroplating and metal finishing 9 cal <br />to the p g 9 Plants apply in any part <br />proposed facility. <br />Local pretreatment limit. -.;ions for the Metropolitan <br />set by the Disposal System (MDS) <br />as tfetropolit _ Waste Control Commission (MWCC) do apply to the <br />Project (refer to Attachment 3 of the EAW <br />tionS on dischexges (6 MCAR 16.014) which awhich <br />hepresens the MDS limita- <br />standards for the ' pretreatment <br />project). In any case, all requirements will be included <br />in the Industrial Wastewater Discharge Permit to he issued by the MwCC. <br />Page 3a, Item 22 - Add to the last paragraph: <br />The Agency staff expects th&t there will be a <br />Of metals to be discharged t4 the sanit greater reduction in the amount <br />than if each individual metal waste generator <br />(Personal with the proposed project <br />(personal communication - g pretreated its own castes. <br />Randy Annette, MPCA Division of hater Quality <br />Permits Section, 8/22/83) <br />Page 3h, Item 24a- Add <br />An air quality permit would also be required if a new boiler were to be <br />installed for the facility, if it tripped permit requirements in APC-3. <br />In addition, PZM permit conditions will require that federal air emission <br />standards be met at the facility, i.e., under RCRA hazardous waste storage <br />Permits, vOlatiles from storage tanks must not exceed federal air emission <br />standards. <br />