My WebLink
|
Help
|
About
|
Sign Out
Home
pf_01547
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF1000 - PF1999
>
1500-1599
>
pf_01547
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2024 9:14:19 AM
Creation date
2/22/2024 9:02:59 AM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
1547
Planning Files - Type
Zoning Text Amendment
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
* Shipment in approved vehicles and containers. <br />* Route specification. <br />* Operator safety and emergency training and equipment. <br />Siting <br />* Compliance with prohibitions on utilization of floodplain <br />shoreland, wetland and other environmentally sensitive <br />areas. <br />* Satisfaction of hydrogeological, seismic, safety and <br />surface water runoff requirements. <br />Construction <br />* Specific facility design and material requirements including <br />those for: the foundation, primary and secondary vat and <br />tank storage and spill containment, building pad and <br />subsurface construction, loading and unloading area, <br />internal and external fire and safety features, berming, <br />diking and fencing. <br />* Specific facility equipment type, size and design <br />requirements. <br />Operations <br />* Compliance with approved Operations Plan. <br />* Specialized requirements relating to waste combination <br />and preventing comingling of incompatible wastes. <br />* Emergency procedures plan including requirements relating <br />to equipment and personnel for spills, fires and other <br />contingencies; measures to mitigate effects of equipment <br />failure or power outages. <br />* Personnel training instruction procedures and certification. <br />* Compliance with approved site, facility, equipment and <br />materials monitoring, testing and maintenance plan capable <br />of continuous assessment to prevent adverse impacts on <br />soil, groundwater, air, personnel and users. <br />* Fences, gates, locks and similar devices to prevent access <br />by nonauthorized personnel. <br />* Communications equipment. <br />* Specific lighting requirements to ensure safety and proper <br />operation and security <br />
The URL can be used to link to this page
Your browser does not support the video tag.