My WebLink
|
Help
|
About
|
Sign Out
Home
CCP 03042024
Roseville
>
City Council
>
City Council Meeting Packets
>
2024
>
CCP 03042024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2024 12:01:42 PM
Creation date
3/20/2024 12:00:16 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Meeting Date
3/4/2024
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
231
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2024 Capital Improvement Plan <br />Project/Initiative Summary <br />Department/Division: Parks and Recreation/Skating Center <br />Project/Initiative Title: OVAL: Lobby Rubber Flooring <br />Total Estimated Cost: $ 50,000 <br />Funding Source: CIP <br />Annual Operating Budget Impact: \[NA\] <br />Project/I <br />nitiative Description: <br />The rubber flooring in the OVAL lobby/changing area is in need of replacement. Over time, all <br />steps on the rubber surface (with skates or shoes) causes the rubber to wear down. We have been <br />replacing pieces of the current rubber every year due to it wearing through to the concrete. <br />Replacing pieces as needed is difficult due to the nature of the facility and foot traffic, it is not <br />aesthetically pleasing as the look of the new rubber doesn’t match. The wearing of the rubber <br />flooring dulls skates which can make skating dangerous as well as diminish the experience of our <br />users as well as the general public <br />Location: <br />OVAL lobby Rubber Flooring <br />Qbhf!277!pg!342 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.