My WebLink
|
Help
|
About
|
Sign Out
Home
2024_0528_PWETC_Packet
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
202x
>
2024
>
2024_0528_PWETC_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2024 2:29:20 PM
Creation date
6/25/2024 2:14:37 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
5/28/2024
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hamline Watermain Project <br />• Project is currently in design and includes upsizing of the watermain along Hamline <br />Avenue from Josephine Road into Arden Hills. The project will be bid later this year. <br />Twin Lakes Trail Phase 2 <br />• Design is complete. Bidding and tree removal later this year for construction next <br />year. <br />Other agency project updates: <br />o Th 36 Multimodal Study (MNDOT) <br />• An update was presented to City Council April 22, 2024. <br />o TH 36 Mill and Overlay from Cleveland to Edgerson Street (MnDOT) <br />• Notes below from recent MnDOT presentation: <br />• Six full weekend directional closures from I35W to Hwy 61. <br />• 10-day ramp closure westbound TH36 to southbound 135 W. <br />• 30-day ramp closure northbound Cleveland to eastbound TH36. <br />o Dale Street 4-3 Conversion from Lovell Avenue into St. Paul (Ramsey County) <br />• Plans going to bid soon for construction this year. <br />o County Road C from Lexington Avenue into Little Canada (Ramsey County) <br />• Project team meetings have begun. Public open house was held May 21 at City Hall. <br />Engineering Updates: <br />o The Assistant City Engineer vacancy has been reposted simultaneously with a Graduate Civil <br />Engineer posting for the same vacancy in an effort to get more applicants. <br />o All five seasonal interns have started in May. <br />Sustainability Updates: <br />o Staff attended Rice & Larpenteur Alliance's Community in Bloom on Saturday, May 9, <br />providing outreach about Green To Go and the bike plan. <br />o Roseville's Less Mow May efforts were featured in a Star Tribune article on April 27 as well <br />as a WCCO news sempent on Mav 2. <br />o Staff presented at the Harriet Alexander Nature Center on Wednesday, May 8 as part of their <br />new "Nature at Nine" series. The presentation topic was "Nurturing Climate Optimism in the <br />Face of Climate Change." <br />o Staff was appointed to Ramsey County's Waste Reduction Advisory Committee to assist with <br />the development of their future solid waste management plan, attending four meetings in April <br />and May with other community members and industry experts. <br />https://www.ramseycounty.us/residents/recycling-waste/waste-reduction-action <br />o Green To Go outreach continues, with staff working on translating outreach materials and <br />planning additional engagement events. <br />Maintenance Updates: <br />o Street and Storm <br />• Regraded & paved Owasso Hills Park pathway. <br />• Replaced ped ramps at City Hall. <br />• Completed with concrete repairs, mill and overlay of Oval's north lot. <br />• Ongoing Street patching. <br />PWET Communications Memo Page 2 <br />Page 11 of 115 <br />
The URL can be used to link to this page
Your browser does not support the video tag.