Laserfiche WebLink
144.D. Ox Removal of organic matter via street sweeping. <br />144.E. Ox Implementation of infiltration structural stormwater BMPs. <br />144.F. ® Management of areas that attract dense populations of waterfowl (e.g., riparian plantings). <br />144.G. ❑ Other (describe below)'. <br />144. H. <br />145. Permit item 12.9: If yes in Q141, who is or will be responsible for implementation of this required component (i.e., <br />inventory, plan, and BMP implementation)? List name(s) or position title(s)'. <br />Environmental Manager <br />`146. Permit item 22.6: Do you have an applicable W LA where a reduction in pollutant loading is required for chloride? <br />0 Yes <br />❑ No (Skip to Q151) <br />147. If yes in 0146, do you document the amount of deicer applied each winter maintenance season to all your <br />owned/operated surfaces? (Note: All or some of this item is a newpermif requirement Compliance with new <br />requirements is required within 12 months after receiving permit coverage.) <br />0 Yes <br />0 No <br />148. If yes in 0146, each calendar year do you conduct an assessment of your winter maintenance operations to reduce <br />the amount of deicing salt applied to your owned/operated surfaces and determine current and future opportunities <br />to improve BMPs? you may use the MPCA's Smart Salting Assessment Tool or other available resources and <br />methods to complete this assessment. The assessment must be documented. (Note: All or some of this item is a <br />new permit requirement Compliance with new requirements is required within 12 months after receiving permit <br />coverage.) <br />0 Yes <br />❑ No (Skip to Of 50) <br />149. If yes in 0149, what does your winter maintenance operations assessment include? (Check all that apply) <br />149.A. Ox Operational changes such as pre wetting, pretreatingthe salt stockpile, increasing plowing prior to deicing, <br />monitoring of road surface temperature, etc. <br />149.B. Ox Implementation of new or modified equipment providing pre wetting, or other capability for minimizing salt use. <br />149.C. Ox Regular calibration of equipment. <br />149.D. Ox Optimizing mechanical removal to reduce use of deicers. <br />149.E. Ox Designation of no salt and/or low salt zones. <br />149.F. ❑ Other (describe below)'. <br />149.G. <br />149. H. Additional information for checked items (optional) <br />150. Permit item 12.9: If yes in 0146, who is or will be responsible for implementation of this required component (i.e., <br />documenting deicer applied and winter maintenance operations assessment)? List name(s) or position title(s): <br />Environmental Manager <br />`151. Permit item 22.7: Do you have an applicable W LA where a reduction in pollutant loading is required for temperature? <br />0 Yes <br />0 No (Skip to Of 55) <br />https//wwwu pc a. state. mn.us • <br />651-296-6300 • <br />806657-3864 • <br />use your preferred <br />relay service • <br />Available in alternative formats <br />wq- trru n9a • 9/23/20 <br />P9b9'6&6f <br />115 <br />