Laserfiche WebLink
136.D. CE Schedule(s) for maintenance of structural stormwater BMPs and outfalls when necessary maintenance cannot <br />be completed within one year of discovery (Note: All or some of this item is anew permit requirement <br />Compliance with new requirements is required within 92 months after receiving permit coverage.) <br />136. E. Cx Stormwater management training events, including general subject matter covered, names and departmentsof <br />individuals in attendance, and date of each event. <br />*137. Permit item 21.14: Do you document pond sediment excavation and removal activities? <br />© Yes <br />❑ No (Skip to Q139) <br />138. If yes in 0137, what pond sediment excavation and removal activity information is documented? <br />(Check all that apply) <br />138.A. A unique ID number and geographic coordinate of each stormwater pond from which sediment is removed. <br />138.B. The volume (e.g., cubic yards) of sediment removed from each stormwater pond. <br />138.C. ® Results from any testing of sediment from each removal activity. <br />138.DLocation(s) offinal disposal ofsedimentfrom eachstormwater pond. <br />138.E. Additional information forchecked items (optional)'. <br />*139. Permit item 12.4: W no is responsible for implementation of this MCM? List name(s) or position title(s). <br />Environmental Manager <br />140. Provide any additional information about your current pollution prevention/good housekeeping for municipal <br />operations program that you would like to share (optional): (Maximum 10 lines of text) <br />Discharges to Impaired Waters with an EPA -Approved TMDL that Includes an Applicable Waste Load <br />Allocation (W LA) <br />To determine if you have an applicable W LA(s), please reference the MPCAs M84 Permit TMDL Application Form webpage at <br />httos'.//stormwater adds statemn.us/index. oho?title=Guidance for cemoletina the M84 Permit TMDL Aoolication Form. <br />*141. Permit item 22.3: Do you have an applicable W LA where a reduction in pollutant loading is required for bacteria? <br />© Yes <br />❑ No (Skip to Q146 ) <br />142. If yes in 0141, do you maintain a written or mapped inventory of potential areas and sources of bacteria (e.g., <br />dense populations ofwaterfowl or other bird, dog parks)? (Note: All orsome of this item is a newpermit <br />requirement Compliance with new requirements is required within 92 months after receivingpermit coverage.) <br />© Yes <br />❑ No (Skip to Q145) <br />143. If yes in 0142, do you maintain a written plan to prioritize reduction activities to address the areas and sources <br />identified in the inventory? The written plan must include BMPs you will implement over the permit term. <br />(Note: All or some ofthis item is a newpermit requirement Compliance with new requirements is required within <br />92 months after receiving permit coverage.) <br />Ox Yes <br />❑ No (Skip to Q145) <br />144. If yes in 0143, which of the following are included in your written plan? (Check all that apply) <br />144 A. Water quality monitoring to determine areas of high bacteria loading. <br />144.B. Installation of pet waste pick-up bags in parks and open spaces. <br />144.0Elimination of over spray irrigation at permittee land owned areas. <br />hUps//www.pca.state.mn.us • 651296-6300 • 806657-3860 • use your preferred relay service • Available in alternative formats <br />wq st ru"a • 9123120 i9°e°g2e'696f 115 <br />