My WebLink
|
Help
|
About
|
Sign Out
Home
2024_0924_PWETC_Packet
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
202x
>
2024
>
2024_0924_PWETC_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2024 11:56:55 AM
Creation date
9/25/2024 11:42:55 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
9/24/2024
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 1 <br />leNZ-AR <br />Public Works Department <br />Memo <br />To: Public Works Environmental and Transportation Commission Members <br />From: Jennifer Lowry, City Engineer <br />Date: September 24, 2024 <br />Re: Communications Items <br />The following are updates to projects and other activities happening in Roseville since the last <br />commission meeting: <br />Roseville Public Works project updates: <br />• McCarron Retaining Wall Replacement <br />o Construction of the wall is progressing and is expected to be completed in late <br />September. <br />o South McCarron Blvd is closed from Glenwood Avenue to Woodruff Avenue, but <br />the trail remains open. <br />• County Road B Reconstruction, west of Cleveland Avenue <br />o New curbs and driveways have been installed. The first layer of pavement is <br />scheduled for September 23. Grading for the trail and behind the curb will begin <br />shortly thereafter. Work should be done by late October. <br />• 2024 PMP <br />o Portions of the PMP in the Midland Hills neighborhood adjacent to the reconstruction <br />project and Midland Grove Road will be done in coordination with the reconstruction. <br />Other streets that are a part of the PMP are complete. <br />County Road B Reconstruction from Snelling Avenue to Lexington Avenue (Ramsey County) <br />o Work on the final phase of construction has begun. All work west of Pascal Street is <br />completed and the road is fully open. <br />o Work is ongoing east of Pascal Street. Traffic is only open to eastbound traffic. <br />o Removals are ongoing. Watermain is being replaced between Dellwood Avenue and <br />Merrill Street. <br />o The overall project is still scheduled for completion by the end of November. <br />2024 Sewer Lining Project <br />o Lining of sewer continues in various locations throughout the city. Properties <br />impacted by the lining will be contacted in advance. The project should be completed <br />next week. <br />2024 Pathways Project <br />o The project is currently in design and includes Lexington Avenue, between County <br />Road B and TH 36, the Wagner Street to Western Avenue cul-de-sac connection, and <br />Page 7 of 185 <br />
The URL can be used to link to this page
Your browser does not support the video tag.