My WebLink
|
Help
|
About
|
Sign Out
Home
2024_0924_PWETC_Packet
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
202x
>
2024
>
2024_0924_PWETC_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2024 11:56:55 AM
Creation date
9/25/2024 11:42:55 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
9/24/2024
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tamarack Park pathways, shown in Attachment 2. The project will be bid later this <br />year and construction may expand into 2025. <br />• Bike Plan <br />Another draft was recently sent to the Bike Plan Committee to review. Committee <br />meeting to be scheduled the last week of September. A public comment period is <br />anticipated to be the majority of the month of October. Comments will be addressed <br />and final revisions made. The committee will again meet when the final plan is <br />delivered in December. <br />PWET can expect an update each month to share new information either in this <br />communications memo or as an agenda item. We will be sure to allow the commission <br />an opportunity to review the draft and provide input. Please contact Jennifer if you <br />have questions. https://talk.dot.state.mn.us/roseville-bike-plan <br />Other agency project updates: <br />• TH 36 Mill and Overlay from Cleveland Avenue to Edgerson Street (MnDOT) <br />o All major work is completed. Some final ADA upgrades and pavement markings <br />remain. <br />o Dale Street 4-3 Conversion from Lovell Avenue into St. Paul (Ramsey County) <br />o Works is underway. Traffic will be reduced to one lane in each direction during <br />construction. Work is anticipated to be done in early November. <br />Old Highway 8 Project (Ramsey County) <br />o Project is from County Road D going north into New Brighton. Closures in New <br />Brighton began August 20. <br />• Neel Gas <br />Commerce Street to Pascal Street to County Road B (Snelling Service Drive to Pascal <br />Street) (Neel Gas) <br />• Gas main work. Impacts to road are being coordinated with County's County <br />Road B project No road closures at this time. <br />Cleveland Avenue from County Road C to Oakcrest Avenue and Oakcrest Avenue <br />from Prior Avenue to Cleveland Avenue (Neel Gas) <br />• Southbound Cleveland Avenue, south of County Road C to Rosegate, will be <br />closed until early September. <br />• Lane shifts and sidewalk closure on Cleveland Avenue, from Rosegate to <br />Oakcrest, in place. <br />o Lane shifts on Oakcrest Avenue from just east of Prior Avenue to Cleveland Avenue, <br />sidewalk closure in place along north side of Oakcrest. Lane shifts and sidewalk <br />closure on Cleveland Avenue from Rosegate to Prior Avenue in place. <br />o Long Lake Road, Terminal Road to Partridge Road. Work begins September 23. Lane <br />shits in place for most of the project. Northbound Long Lake between County Road C <br />and the I 35 W ramps will be closed for a period of time. <br />Ramsey County Ditch 4 from Oasis Park to Lake Johanna (Rice Creek Watershed) <br />o Tree and brush removal is completed. <br />PWET Communications Memo Page 2 <br />Page 8 of 185 <br />
The URL can be used to link to this page
Your browser does not support the video tag.