Laserfiche WebLink
news media, and use other means to contact residents. The City will be responsible for notifying <br />the residents by municipal cable TV, email notification, and any other means identified by the <br />City. Collection will be made the following business day. <br />2.14 Weighing of Loads <br />Contractor will keep accurate records consisting of the date, time, collection route, driver's <br />identification, vehicle number, tare weight, gross weight, net weight, and number of recycling <br />stops for each loaded vehicle. Collection vehicles will be weighed empty before collection to <br />obtain a tare weight and weighed after completion of a route or at the end of the day, whichever <br />occurs first. These records shall be maintained on file by the Contractor for at least three years in <br />the event of an audit by the City or County. <br />2.15 Ownership <br />Ownership of the recyclables shall remain with the person placing them for collection until <br />Contractor's personnel physically touches the recyclables for collection, at which time ownership <br />shall transfer to the Contractor. <br />2.16 Scavenging Prohibited <br />Any person or persons taking recyclable materials from a recycling container without explicit <br />permission of the inhabitant of a RDU or the owner or manager of a MDU complex will be in <br />violation of local ordinance (City Code 403.03) and subject to penalty. The Contractor shall <br />report to the City any instances of suspected scavenging or unauthorized removal of recyclable <br />materials from any collection containers. <br />Contractor will immediately report all witnessed scavenging to Roseville's Police dispatch <br />(651-767-0640.) <br />2.17 Utilities <br />The Contractor shall be obligated to protect all public and private utilities, whether occupying <br />street or public or private property. If such utilities are damaged by reason of the Contractor's <br />operations, under the executed Contract, he/she shall repair or replace same, or failing to do so <br />promptly, the City shall cause repairs or replacement to be made, and the cost of doing so shall <br />be deducted from payment to be made to the Contractor. <br />2.18 Damage to Property <br />The Contractor shall take all necessary precautions to protect public and private property during <br />the performance of this Contract. The Contractor shall repair or replace any private or public <br />property, including but not limited to sod, mailboxes, or recycling bins/carts that are damaged by <br />the Contractor. Such property damage shall be addressed for repair or replacement within <br />48 hours with property of the same or equivalent value at the time of the damage, at no charge to <br />the property owner. <br />RFP for City of Roseville Recycling Services . A-13 <br />RS160\1\934842.vl <br />Page 82 of 185 <br />