My WebLink
|
Help
|
About
|
Sign Out
Home
2024_1022_PWETC_Packet
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
202x
>
2024
>
2024_1022_PWETC_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2024 3:45:16 PM
Creation date
10/21/2024 3:41:37 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
10/22/2024
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
will be shared with the Bike Plan Committee, PWET and the Parks Commission, and <br />the public for review and comment. <br />The demonstration project, intended to be the addition of buffer and bollard protected <br />bike lanes on Hamline Avenue between County Road B and County Road B2, is in <br />design and anticipated to be installed next spring or summer. <br />PWET can expect an update each month to share new information either in this <br />communications memo or as an agenda item. Please contact Jennifer if you have <br />questions. https://talk.dot.state.mn.us/roseville-bike-plan <br />Other agency project updates: <br />• TH 36 Mill and Overlay from Cleveland Avenue to Edgerson Street (MnDOT) <br />o All major mainline work is complete and no additional closures are known. <br />• Dale Street 4-3 Conversion from Lovell Avenue into St. Paul (Ramsey County) <br />o Traffic is reduced to one lane in each direction for curb and gutter repairs. <br />o The signal at Dale and County Road B is being replaced. <br />o Mill and overlay of the pavement has been pushed back to 2025. <br />o Roseville successfully removed a watermain valve in the intersection of Dale and <br />County Road B and placed a new valve on Belmont Lane, just west of Dale Street, the <br />night of October 16. <br />Cleveland Avenue from County Road C to Oakcrest Avenue and Oakcrest Avenue from Prior <br />Avenue to Cleveland Avenue (Neel Gas) <br />o Work is complete and Neel has been contacted to remove traffic control devices. <br />Long Lake Road from Terminal Road to Partridge Road (Neel Gas) <br />o Lane shits in place south of County Road C to County Road C2. Long Lake between <br />County Road C and the I 35 W ramps may be closed for a period of time. <br />Engineering Updates: <br />• None at this time. <br />Sustainability Updates: <br />• Roseville, Ramsey County, and the American Lung Association hosted an electric vehicle ride <br />and drive event on Saturday, October 13, featuring electric vehicle test drives, EV owners <br />showcasing their vehicles and answering questions, electric yard care equipment, and electric <br />bicycle test rides. <br />• Staff will attend the Urban Sustainability Directors' Network national conference in <br />Minneapolis October 20-23. <br />Maintenance Updates: <br />• Streets Superintendent Steve Zweber retires after 26 years at Roseville on October 22. The <br />position has been posted and interviews will be held soon. <br />• Street and Storm <br />Completed pathway reclamation and paving Acorn Park. <br />Gates are now open for drive-in drop-off of leaves at the compost site. <br />Third sweep complete. <br />PWET Communications Memo Page 2 <br />Page 10 of 78 <br />
The URL can be used to link to this page
Your browser does not support the video tag.