My WebLink
|
Help
|
About
|
Sign Out
Home
2024_1022_PWETC_Packet
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
202x
>
2024
>
2024_1022_PWETC_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2024 3:45:16 PM
Creation date
10/21/2024 3:41:37 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
10/22/2024
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 1 <br />leNZ-AR <br />Public Works Department <br />Memo <br />To: Public Works Environmental and Transportation Commission Members <br />From: Jennifer Lowry, City Engineer <br />Date: October 18, 2024 <br />Re: Communications Items <br />The following are updates to projects and other activities happening in Roseville since the last <br />commission meeting: <br />Roseville Public Works project updates: <br />• McCarron Retaining Wall Replacement <br />o Construction of the wall is complete. Restoration should be completed, and the road <br />reopened, by the end of October. <br />• County Road B Reconstruction, west of Cleveland Avenue <br />o The project will be substantially complete by the end of October. As assessment <br />hearing will be scheduled for late 2024 or early 2025. <br />• 2024 PMP <br />o Portions of the PMP in the Midland Hills neighborhood adjacent to the reconstruction <br />project and Midland Grove Road have been milled and are scheduled for paving the <br />week of October 21. Other streets that are a part of the PMP are complete. <br />• County Road B Reconstruction from Snelling Avenue to Lexington Avenue (Ramsey County) <br />o Work is ongoing east of Pascal Street. Traffic is only open to eastbound traffic. <br />o The overall project is anticipated to be complete the week of November 11. <br />• 2024 Sewer Lining Project <br />o Project is complete. <br />• 2024 Pathways Project <br />o The project is currently in design and includes Lexington Avenue, between County <br />Road B and TH 36, the Wagner Street to Western Avenue cul-de-sac connection, and <br />Tamarack Park pathways, shown in Attachment 2. The project will be bid later this <br />year, with construction in 2025. <br />• Lighting <br />o A streetlight update will be given at the meeting. <br />o Staff is working to repair the Dale Street Tunnel Lights. <br />o City Hall parking lot lights will be replaced in the next few weeks. <br />• Bike Plan <br />o The draft provided last September was not ready for committee nor public review. <br />Staff met with the consulting team and revisions are being made. When ready, a draft <br />Page 9 of 78 <br />
The URL can be used to link to this page
Your browser does not support the video tag.