My WebLink
|
Help
|
About
|
Sign Out
Home
CCP 01062025
Roseville
>
City Council
>
City Council Meeting Packets
>
2025
>
CCP 01062025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2025 12:49:47 PM
Creation date
1/13/2025 12:49:24 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Meeting Date
1/6/2025
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />132 Actions. <br />133 <br />134 Municipal State Aid (MSA): <br />135 • Lexington Avenue pathway from TH36 to County Road B2 (also funded by County) <br />136 • County Road C design from Lexington Avenue to 35E (also funded by County) <br />137 • Rice Street design from Larpenteur Avenue to County Road B (also funded by County) <br />138 <br />139 Street Replacement Fund: <br />140 • PMP <br />141 <br />142 Pathway & Parking Lot Fund: <br />143 • Twin Lakes Trail Phase 2 (also funded with developer funds) <br />144 • Wagner Avenue/Western Avenue pathway <br />145 • Tamarack Park pathway (funded with Park Renewal Funds) <br />146 • Villas Park pathway resurfacing <br />147 • Fairview & CR B pathway resurfacing <br />148 • County Road C west of Cleveland Avenue pathway resurfacing <br />149 <br />150 Lighting Fund: <br />151 • Centre Pointe Drive light replacement <br />152 • Arthur Street light replacement <br />153 <br />154 Utility Enterprise Funds (water, storm, sanitary): <br />155 • Various utility improvement standalone projects like sewer lining and lift station <br />156 rehabilitations, or improvements such as structure repairs as a part of the PMP. <br />157 <br />158 Staff Recommendations <br />159 Staff recommends Council approve the Public Works 2025 Work Plan. By taking action <br />160 now, the Council will be authorizing staff to work on plans for the projects as described and <br />161 to advertise for bids once plans are finished. Additional improvements may be identified at <br />162 a later date and brought to the Council for authorization. All contracts will come back to the <br />163 City Council for further action. <br />164 <br />165 Requested Council Action <br />166 Motion to approve the Public Works 2025 Work Plan. <br />167 <br />168 <br />Jennifer Lowry, Assistant Public Works Director / City Engineer <br />Prepared by: <br />1. 2025 All Projects Map <br />Attachments: <br />2. PWETC Draft Minutes <br />3. Presentation <br />4. Equity Toolkit <br />169 <br />Page 4 of 4 <br />Qbhf!72!pg!33: <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.