My WebLink
|
Help
|
About
|
Sign Out
Home
25_0128_PWETC_Packet
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
202x
>
2025
>
25_0128_PWETC_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2025 9:28:41 AM
Creation date
1/29/2025 9:27:48 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
1/28/2025
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 (c) Enhanced Street Light: When the location, design, or spacing for requested lights <br />2 does not meet the "Standard Street Light' qualifying conditions, property owners <br />3 may request that the City undertake an "Enhanced Street Lighting" project. <br />4 (d) Long side: On a corner lot or multiple frontage lot, the frontage of a property that <br />5 is longest. <br />6 (e) Private Driveway: A driveway or road that serves as a primary access for one or <br />7 more property owners that is not maintained by the City of Roseville, MnDOT or <br />8 Ramsey County. <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />27 <br />(f) Required Drainage: Drainage improvements necessary because of an <br />improvement project. This can be the result of meeting City, watershed or <br />wetland requirements. Includes rate control, water quality treatment, infiltration, <br />and wetland mitigation. <br />(g) Roadway Reconstruction Project: This type of project involves removing and <br />replacing the existing roadway bituminous, more than 50% of the concrete curb, <br />the base materials, and oftentimes performing utility work (water, sewer, etc.) at <br />the same time. <br />(h) Roadway Maintenance Project: Performing a Reclaim and Overlay, Mill and <br />Overlay, or sealcoating of city streets. <br />(i) Short side: On a corner lot or multiple frontage lot, the frontage of a property that <br />is shortest. <br />(j) Standard Street Light: street light installation that meets the location, design and <br />spacing of the City street light policy qualifying conditions described in section <br />IV. B. of the City Street Light policy. <br />(k) Total Project Cost: Project costs include actual construction cost plus all <br />associated overhead costs. The total cost of the associated overhead for a public <br />improvement project would typically include city administration, engineering, <br />fiscal, legal, capital interest, right of way acquisition and contingencies. <br />Assessment Policy Summary <br />Adopted 12/10/12 <br />Page 5 of 5 <br />Page 42 of 43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.