My WebLink
|
Help
|
About
|
Sign Out
Home
25_0128_PWETC_Packet
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
202x
>
2025
>
25_0128_PWETC_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2025 9:28:41 AM
Creation date
1/29/2025 9:27:48 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
1/28/2025
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o Improvements include new roof, tuckpointing, thermal & acoustical treatments and <br />other facility updates. Roof work will be done in coordination with solar install (see <br />grant info in the Sustainability updates below). <br />• 2025 Pavement Management Project <br />o Design underway for mill and overlay / pavement reclamation project to be <br />constructed in 2025. <br />• Wayfinding Signage <br />o Pedestrian level signs are being manufactured and permits being obtained for <br />installation summer 2025. <br />Lighting <br />o Repair of the Dale Street tunnel lights is complete. However, two freestanding light <br />fixtures on either side of the tunnel still await new fixtures. <br />o Neel has installed 13 of the 14 lights identified for install in 2024. In 2025, we will <br />request 28 new streetlights be installed per City request, based on new lighting policy. <br />o Replace Centre Pointe Drive and Arthur street lighting with a new contract with Neel. <br />• Bike Plan <br />o The Bike Plan Committee has received a draft to review. Next steps will include <br />review by PWET and the Parks Commission, and the public. <br />o The demonstration project, intended to be the addition of buffer and bollard -protected <br />bike lanes on Hamline Avenue, between County Road B and County Road B2, is in <br />design and anticipated to be installed next spring or summer. <br />Other agency project updates: <br />• Ramsey County <br />o Dale Street from Lovell Avenue into St. Paul <br />• The replacement of the signal at Dale Street and County Road B is complete. <br />• Mill, overlay and 4 to 3 lanes restriping will occur in the spring. <br />o Hamlin Avenue/Clarmar Lane Storm Sewer <br />• County to add to and replace existing storm sewer to address flooding and <br />aging infrastructure in 2025. <br />o County Road D from Highcrest Road to 88 <br />• City received draft plans for mill and overlay to review for 2025 construction. <br />o County Road C 4-3 Conversion from Lexington to 35E and bridge over railroad <br />• City Council decided to remove the proposed trail on the north side of County <br />Road C from Western Avenue to Dale Street at their January 6 meeting in <br />response to a resident petition. <br />• 4-3 lane conversion with mill and overlay schedule for 2026. <br />• Bridge redecking or replacement received federal funding and tentatively <br />planned for 2028. <br />• MnDOT <br />o TH 36 Multimodal Study Document <br />• Expected to be finalized this quarter <br />o Snelling Design from TH 36 to Grey Fox <br />• In design for 2026 resurfacing <br />PWET Communications Memo Page 2 <br />Page 9 of 43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.