Laserfiche WebLink
2.Data Collection <br /> Department interviews <br /> Site survey/walk through <br /> <br />3.Concept Development <br /> Phase 1 <br />o Provide an updated cost estimate of the proposed LPCDS which is proposed in the <br />CCPDS. <br />o Provide an updated cost estimate of Maintenance Operations Center as proposed in <br />the CCPDS. <br />o Provide cost estimate for a single story LPCDC instead of the two-story plan. <br />o Provide feasibility options to reuse portions of existing MF for LPCDS use. <br /> Provide building and site plan layouts and cost estimates. The report should <br />include pros and cons of this option compared to the CCPDS option. The <br />report should also provide information on how this option would affect the <br />overall phasing of the overall project. <br />o Provide feasibility options to reuse portions of existing MF for other uses such as <br />office space, restaurant, or event venue use. <br /> Provide building and site plan layouts and cost estimates. The report should <br />include pros and cons of this option compared to the CCPDS option. The <br />report should also provide information on how this option would affect the <br />overall phasing of the overall project. <br />o Provide report and presentation to council. <br /> Phase 2 – Only if authorized after Phase 1, if needed. <br />o Provide two alternative options for LPC on City Campus that would result in a <br />cost savings for the City. <br />o Provide alternative designs to consider for all aspects of the CCPDS. <br />o Provide report and presentation to Council. <br /> <br />4. Council/Commission Presentations <br /> Provide one presentation to the City Council once the final report is completed for each <br />phase. <br />5. Public Engagement <br />No public engagement work from the consultant is anticipated for this phase of the project. <br /> <br />6. Final Report <br /> <br /> Final written report identifying process, background, concept development/evolution, <br />potential costs and final recommendations. <br /> Delivery of final report shall include electronic (PDF and editable CAD) file formats of <br />all concepts/building configurations. <br /> <br />7. Schedule <br />RS160\\21\\1007882.v1 <br />Qbhf!41!pg!596 <br /> <br />