My WebLink
|
Help
|
About
|
Sign Out
Home
25_0225_PWETC_Packet
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
202x
>
2025
>
25_0225_PWETC_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 10:25:44 AM
Creation date
3/24/2025 10:23:45 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
2/25/2025
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 1 <br />lei <br />Public Works Department <br />Memo <br />To: Public Works Environmental and Transportation Commission Members <br />From: Jennifer Lowry, City Engineer <br />Date: February 21, 2025 <br />Re: Communications Items <br />The following are updates to projects and other activities happening in Roseville since the last <br />commission meeting: <br />Roseville Public Works project updates: <br />• Maintenance Operation Center (MOC) / License & Passport Centers (LPC) / Dance <br />Studio <br />o An RFP is out to hire a consultant to perform more analysis of LPC/Dance Studios <br />options. <br />o Proposals are due March 3 and Council will consider awarding a contract on <br />March 17. <br />• 2024 Pathways Project <br />o The project is currently in design and includes Lexington Avenue, between <br />County Road B and TH 36, the Wagner Street to Western Avenue cul-de-sac <br />connection, and Tamarack Park pathways. <br />• Hamlin Avenue <br />o Construction of pathway from County Road C to Josephine Road in 2026 will <br />begin design 2025 and be constructed in coordination with the water and road <br />work noted below. <br />o Resurfacing from County Road C to County Road C2 in 2026 will be designed <br />and lead by Roseville and paid by Ramsey County. <br />o Upsizing of the watermain from Josephine Road to Glenhill Road/Arden Hills. <br />Paid primarily by Arden Hills. <br />• Twin Lakes Trail Phase 2 <br />o Easement to be approved by Council and tree removal to be performed during <br />winter. Trail construction planned for 2025. <br />• Dale/Owasso Lift Station Rehab <br />o Minor grading and tree removal will be scheduled soon. Construction anticipated <br />to begin in late April/early May. <br />• 2025 Sewer Lining <br />o Consultant was obtained last month to prepare bid documents for lining of larger <br />more complex storm and sanitary sewer pipes. Additional areas from 2025 PMP <br />will also be added. Work to be bid later in 2025. <br />Page 11 of 43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.