My WebLink
|
Help
|
About
|
Sign Out
Home
25_0318_PWETC_Packet
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
202x
>
2025
>
25_0318_PWETC_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 10:42:03 AM
Creation date
3/24/2025 10:35:52 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
3/18/2025
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Booster Station Phase 4 Improvements <br />o Improvements likely to include new roof, tuckpointing, thermal and acoustical <br />treatments and other facility updates. Roof work will be done in coordination with <br />solar install. Bid package to be released likely later this year. <br />• 2025 Pavement Management Project <br />o Design underway for mill and overlay / pavement reclamation project to be <br />constructed in 2025. <br />• Wayfinding Signage <br />o Pedestrian level signs are being manufactured, and permits being obtained for <br />installation summer 2025. <br />• Lighting <br />o Repair of the Dale Street tunnel lights is complete. <br />o Neel has installed 13 of the 14 lights identified for install in 2024. In 2025, we will <br />request —29 new streetlights be installed per City request, based on new lighting <br />policy. <br />o Staff is working to replace Centre Pointe Drive and Arthur Street lighting with a <br />new contract with Neel for later in 2025. <br />• Bike Plan <br />o Edits are being made to the draft. Next steps will include review by PWET and the <br />Parks Commission, and the public. <br />o The demonstration project, intended to be the addition of buffer and bollard - <br />protected bike lanes on Hamline Avenue, between County Road B and County <br />Road B2, is in design and anticipated to be installed in May. <br />Other agency project updates: <br />• Ramsey County <br />o Dale Street from Lovell Avenue into St. Paul <br />• Mill, overlay and 4 to 3 lanes restriping will occur in the spring. <br />o Hamlin Avenue/Clarmar Lane Storm Sewer <br />• County to add to and replace existing storm sewer to address flooding and <br />aging infrastructure in 2025. <br />o County Road D from Highcrest Road to 88 <br />• City reviewed draft plans for mill and overlay for 2025 construction. <br />o County Road C 4-3 Conversion from Lexington to 35E and bridge over railroad <br />• 4-3 lane conversion with mill and overlay scheduled for 2026. <br />• Bridge redecking or replacement received federal funding —schedule <br />TBD. <br />• MnDOT <br />o TH 36 Multimodal Study Document <br />• Final report has been drafted, and staff will let PWET know when it is <br />released. <br />o Snelling Design from TH 36 to Grey Fox Road <br />• In design for 2026 resurfacing and will include off -road pathway west of <br />Snelling Avenue from Lydia Avenue to the north. <br />PWET Communications Memo Page 2 <br />Page 17 of 72 <br />
The URL can be used to link to this page
Your browser does not support the video tag.