Laserfiche WebLink
CONCEPT 6 I LICENSE CENTER + DANCE STUDIO <br />DEMOLISHED BLDG <br />SHOWN DASHED <br />Project Cost: $18.2M <br />PARIGNG CALCULATIONS <br />VFW 68 <br />ACTIVITY DANCE STUDIO 43 <br />AREA <br />PATIO �������• ; LICENSE/PASSPORT 42 <br />O <br />�1 TOTALREQUIRED 152 <br />' TOTAL PROVI DIED 143 <br />O <br />LOADING <br />J' Summary <br />LICENSE/PASSIIp O = Demolish North and South portions of maintenance <br />CENTER building. New public parking lot with new building <br />entrances facing east. Public parking lot connects to City <br />0— Hall parking. <br />n ( PROS: <br />Uses newer portion of existing buildings <br />_ VFW access to large green spaces for events, etc. <br />Planned use requires less parking <br />North and South buildings in poor condition are <br />demolished <br />New public parking connected to existing City Hall <br />4 parking <br />+ CONS: <br />N, - Does not meet code required parking <br />- Large parking area; limited greenspace <br />ROSEVILLE CIVIC CAMPUS I MASTER PLAN UPDATE <br />CITY COUNCIL UPDATE 1 06/16/2025 <br />