Laserfiche WebLink
CONCEPT C.1 1 MOC + LPC/DS <br />�- <br />A <br />ROSEVILLE CIVIC CAMPUS I MASTER PLAN UPDATE <br />CITY COUNCIL UPDATE 1 06/16/2025 <br />Project Cost: $60.8M (MCIC) + $14.5M (LPC/DS) = $75.3M <br />PARKING CALCULATIONS <br />VFW <br />fib <br />DANCE STUDIO <br />48 <br />LICENSE/PASSPORT <br />38 <br />TOTAL REQUIRED <br />ISS <br />TOTAL PROVIDED <br />179 <br />Summary <br />Renovation of portions of the existing Maintenance Operations <br />Facility with building expansion both south and north of Woodhill <br />Drive. New two-story building is constructed for the <br />License/Passport Center and Dance Studio on Western side of site. <br />PROS: <br />- Yard area geometry allows more flexibility of use <br />- South facing salt storage <br />- Larger storage building illustrating more drive lane, allows for <br />adaptability of interior use <br />- Maintains portion of park area <br />- Maintains VFW operations <br />CONS: <br />- Larger building and location cuts off connection to Lexington via <br />north drive <br />- Yard area is smaller <br />- No additional parking is provided to support city hall <br />.M gAa oy <br />