My WebLink
|
Help
|
About
|
Sign Out
Home
CCP 09152025
Roseville
>
City Council
>
City Council Meeting Packets
>
2025
>
CCP 09152025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2025 2:48:55 PM
Creation date
10/21/2025 2:48:42 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Meeting Date
9/15/2025
Meeting Type
Work Session
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
243
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />TABLE OF ARTICLES <br /> <br />1 INITIAL INFORMATION <br /> <br />2 ARCHITECTÔS RESPONSIBILITIES <br /> <br />3 SCOPE OF ARCHITECTÔS BASIC SERVICES <br /> <br />4 SUPPLEMENTAL AND ADDITIONAL SERVICES <br /> <br />5 OWNERÔS RESPONSIBILITIES <br /> <br />6 COST OF THE WORK <br /> <br />7 COPYRIGHTS AND LICENSES <br /> <br />8 CLAIMS AND DISPUTES <br /> <br />9 TERMINATION OR SUSPENSION <br /> <br />10 MISCELLANEOUS PROVISIONS <br /> <br />11 COMPENSATION <br /> <br />12 SPECIAL TERMS AND CONDITIONS <br /> <br />13 SCOPE OF THE AGREEMENT <br /> <br />ARTICLE 1 INITIAL INFORMATION <br />§ 1.1 This Agreement is based on the Initial Information set forth in this Section 1.1. <br />(For each item in this section, insert the information or a statement such as Ðnot applicableÑ or Ðunknown at time of <br />execution.Ñ) <br /> <br />§ 1.1.1 The OwnerÓs program for the Project: <br />(Insert the OwnerÓs program, identify documentation that establishes the OwnerÓs program, or state the manner in which the <br />program will be developed.) <br /> <br /> Design of a two-story License Passport Center and Dance Studio on city property at Veterans Park as indicated in Options <br />C.1 or C.2 in the Civic Campus Master Plan Update completed in 2025. The shared parking lot with the VFW would be <br />reconstructed to accommodate additional parking. <br /> <br />A new Maintenance Operations Center would be constructed in two parts. The main facility south of Woodhill would consist <br />of re-using part of the existing facility and expanding the facility into the existing maintenance yard as indicated in Options <br />C.1 or C.2 in the Civic Campus Master Plan Update completed in 2025. The main garage would be remodeled and reused as <br />part of the construction. Additionally, the Lexington Shoppes building north of Woodhill Drive would be demolished and a <br />new maintenance yard with one storage building, storage bins and fuel system would be constructed. <br /> <br /> <br />§ 1.1.2 The ProjectÓs physical characteristics: <br />(Identify or describe pertinent information about the ProjectÓs physical characteristics, such as size; location; dimensions; <br />geotechnical reports; site boundaries; topographic surveys; traffic and utility studies; availability of public and private <br />utilities and services; legal description of the site, etc.) <br /> <br />AIA Document B133 Î 2019. Copyright ¨ 2014, and 2019. All rights reserved. ÐThe American Institute of Architects,Ñ ÐAmerican Institute of Architects,Ñ ÐAIA,Ñ the <br /> <br />AIA Logo, and ÐAIA Contract DocumentsÑ are trademarks of The American Institute of Architects. This draft was produced at 13:48:18 CDT on 08/13/2025 under <br />2 <br />Subscription No.20250116558 which expires on , is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract <br />® <br />Documents Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. <br />User Notes: (640e2aeef442e4498d096839) <br /> <br />A2 | BKV GROUP <br />Qbhf!2:7!pg!354 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.