My WebLink
|
Help
|
About
|
Sign Out
Home
CCP 09152025
Roseville
>
City Council
>
City Council Meeting Packets
>
2025
>
CCP 09152025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2025 2:48:55 PM
Creation date
10/21/2025 2:48:42 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Meeting Date
9/15/2025
Meeting Type
Work Session
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
243
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />§ 1.1.3 The OwnerÓs budget for the Cost of the Work, as defined in Section 6.1: <br />(Provide total and, if known, a line item breakdown.) <br /> <br /> Projected Construction Budget for MOC: $48,000,000 (Sales Tax Funded) <br />Projected Construction Budget for LPCDS: $11,000,000 (Locally Funded) <br /> <br /> <br />§ 1.1.4 The OwnerÓs anticipated design and construction milestone dates: <br />.1 Design phase milestone dates, if any: <br /> <br /> Final Design Î July 2026 <br /> <br />.2 Construction commencement date: <br /> <br />October 2026 <br /> <br />.3 Substantial Completion date or dates: <br /> <br />Total project completion December 2029 <br /> <br />.4 Other milestone dates: <br /> <br /> <br /> <br />§ 1.1.5 The Owner intends to retain a Construction Manager pursuant to the following agreement: <br />(Indicate agreement type.) <br /> <br />\[ X \] AIA Document A133Î2019, Standard Form of Agreement Between Owner and Construction <br />Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed <br />Maximum Price, as modified. <br />\[ \] AIA Document A134Î2019, Standard Form of Agreement Between Owner and Construction Manager <br />as Constructor where the basis of payment is the Cost of the Work Plus a Fee without a Guaranteed <br />Maximum Price. <br /> <br />§ 1.1.6 The OwnerÓs requirements for accelerated or fast-track design and construction, or phased construction are set forth <br />below: <br />(List number and type of bid/procurement packages.) <br /> <br />Three bid packages <br />#1 -LPCDS <br />#2 Î MOC North of Woodhill <br />#3 Î MOC South of Woodhill <br /> <br />§ 1.1.7 The OwnerÓs anticipated Sustainable Objective for the Project: <br />(Identify and describe the OwnerÓs Sustainable Objective for the Project, if any.) <br /> <br /> <br /> <br />§ 1.1.7.1 If the Owner identifies a Sustainable Objective, the Owner and Architect shall complete and incorporate AIA <br />Document E234©Î2019, Sustainable Projects Exhibit, Construction Manager as Constructor Edition, into this Agreement to <br />define the terms, conditions and services related to the OwnerÓs Sustainable Objective. If E234-2019 is incorporated into this <br />AIA Document B133 Î 2019. Copyright ¨ 2014, and 2019. All rights reserved. ÐThe American Institute of Architects,Ñ ÐAmerican Institute of Architects,Ñ ÐAIA,Ñ the <br /> <br />AIA Logo, and ÐAIA Contract DocumentsÑ are trademarks of The American Institute of Architects. This draft was produced at 13:48:18 CDT on 08/13/2025 under <br />3 <br />Subscription No.20250116558 which expires on , is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract <br />® <br />Documents Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. <br />User Notes: (640e2aeef442e4498d096839) <br /> <br /> BKV GROUP | A3 <br />Qbhf!2:8!pg!354 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.