My WebLink
|
Help
|
About
|
Sign Out
Home
CCP 09152025
Roseville
>
City Council
>
City Council Meeting Packets
>
2025
>
CCP 09152025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2025 2:48:55 PM
Creation date
10/21/2025 2:48:42 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Meeting Date
9/15/2025
Meeting Type
Work Session
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
243
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Agreement, the Owner and Architect shall incorporate the completed E234Î2019 into the agreements with the consultants and <br />contractors performing services or Work in any way associated with the Sustainable Objective. <br /> <br /> <br />§ 1.1.8 The Owner identifies the following representative in accordance with Section 5.4: <br />(List name, address, and other contact information.) <br /> <br />Jesse Freihammer, Public Works Director <br />City of Roseville <br />2660 Civic Center Drive <br />Roseville, MN 55113 <br />651-792-7041 <br />Jesse.Freihammer@cityofroseville.com <br /> <br />§ 1.1.9 The persons or entities, in addition to the OwnerÓs representative, who are required to review the ArchitectÓs submittals <br />to the Owner are as follows: <br />(List name, address, and other contact information.) <br /> <br /> <br /> <br />§ 1.1.10 The Owner shall retain the following consultants and contractors: <br />(List name, legal status, address, and other contact information.) <br /> <br />.1 Construction Manager: <br />(The Construction Manager is identified on the cover page. If a Construction Manager has not been retained <br />as of the date of this Agreement, state the anticipated date of retention. If the Architect is to assist the Owner in <br />selecting the Construction Manager, complete Section 4.1.1.1) <br /> <br /> <br /> <br />.2 Land Surveyor: <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />.3 Geotechnical Engineer: <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />.4 Civil Engineer: <br /> <br /> <br /> <br /> <br /> <br /> <br />AIA Document B133 Î 2019. Copyright ¨ 2014, and 2019. All rights reserved. ÐThe American Institute of Architects,Ñ ÐAmerican Institute of Architects,Ñ ÐAIA,Ñ the <br /> <br />AIA Logo, and ÐAIA Contract DocumentsÑ are trademarks of The American Institute of Architects. This draft was produced at 13:48:18 CDT on 08/13/2025 under <br />4 <br />Subscription No.20250116558 which expires on , is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract <br />® <br />Documents Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. <br />User Notes: (640e2aeef442e4498d096839) <br /> <br />A4 | BKV GROUP <br />Qbhf!2:9!pg!354 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.