<br /> <br />§ 3.1.7 The Architect shall assist the Owner and Construction Manager in connection with the OwnerÓs responsibility for filing <br />documents required for the approval of governmental authorities having jurisdiction over the Project. <br /> <br />§ 3.1.8 Prior to the OwnerÓs acceptance of the Construction ManagerÓs Guaranteed Maximum Price proposal, or the OwnerÓs <br />approval of the Construction ManagerÓs Control Estimate, as applicable, the Architect shall consider the Construction <br />ManagerÓs requests for substitutions and, upon written request of the Construction Manager, provide clarification or <br />interpretations pertaining to the Drawings, Specifications, and other documents submitted by the Architect. The Architect and <br />Construction Manager shall include the Owner in communications related to substitution requests, clarifications, and <br />interpretations. <br /> <br />§ 3.1.9 The Architect shall assist the Owner in the evaluation of the qualifications of entities providing bids or proposals. <br /> <br />£ 3.2 Review of the Construction ManagerÔs Guaranteed Maximum Price Proposal or Control Estimate <br />§ 3.2.1 At a time to be mutually agreed upon by the Owner and the Construction Manager, the Construction Manager shall <br />prepare, for review by the Owner and Architect, and for the OwnerÓs acceptance or approval, a Guaranteed Maximum Price <br />proposal or Control Estimate. The Architect shall assist the Owner in reviewing the Construction ManagerÓs proposal or <br />estimate. The ArchitectÓs review is not for the purpose of discovering errors, omissions, or inconsistencies; for the assumption <br />of any responsibility for the Construction ManagerÓs proposed means, methods, sequences, techniques, or procedures; or for <br />the verification of any estimates of cost or estimated cost proposals. In the event that the Architect discovers any <br />inconsistencies or inaccuracies in the information presented, the Architect shall promptly notify the Owner and Construction <br />Manager. <br /> <br />§ 3.2.2 Upon authorization by the Owner, and subject to Section 4.2.1.14, the Architect shall update the Drawings, <br />Specifications, and other documents to incorporate the agreed upon assumptions and clarifications contained in the <br />Guaranteed Maximum Price Amendment or Control Estimate. <br /> <br />§ 3.3 Schematic Design Phase Services <br />§ 3.3.1 The Architect shall review the program, and other information furnished by the Owner and Construction Manager, and <br />shall review laws, codes, and regulations applicable to the ArchitectÓs services. <br /> <br />§ 3.3.2 The Architect shall prepare a preliminary evaluation of the OwnerÓs program, schedule, budget for the Cost of the <br />Work, Project site, and other Initial Information, each in terms of the other, to ascertain the requirements of the Project. The <br />Architect shall notify the Owner in writing of (1) any inconsistencies discovered in the information, and (2) other information <br />or consulting services that may be reasonably needed for the Project. <br /> <br />§ 3.3.3 The Architect shall present its preliminary evaluation to the Owner and Construction Manager and shall discuss with <br />the Owner and Construction Manager alternative approaches to design and construction of the Project. The Architect shall <br />reach an understanding with the Owner regarding the requirements of the Project and confirm the same in writing with the <br />Owner. <br /> <br />§ 3.3.4 Based on the Project requirements agreed upon with the Owner, the Architect shall prepare and present, to the Owner <br />and Construction Manager, for the OwnerÓs approval, a preliminary design illustrating the scale and relationship of the Project <br />components. <br /> <br />§ 3.3.5 Based on the OwnerÓs approval of the preliminary design, the Architect shall prepare Schematic Design Documents for <br />Construction ManagerÓs review and the OwnerÓs approval. The Schematic Design Documents shall consist of drawings and <br />other documents including a site plan, if appropriate, and preliminary building plans, sections and elevations; and may include <br />some combination of study models, perspective sketches, or digital representations. Preliminary selections of major building <br />systems and construction materials shall be noted on the drawings or described in writing. <br /> <br />§ 3.3.5.1 The Architect shall consider sustainable design alternatives, such as material choices and building orientation, <br />together with other considerations based on program and aesthetics, in developing a design that is consistent with the OwnerÓs <br />program, schedule and budget for the Cost of the Work. The Owner may obtain more advanced sustainable design services as <br />a Supplemental Service under Section 4.1. <br />AIA Document B133 Î 2019. Copyright ¨ 2014, and 2019. All rights reserved. ÐThe American Institute of Architects,Ñ ÐAmerican Institute of Architects,Ñ ÐAIA,Ñ the <br /> <br />AIA Logo, and ÐAIA Contract DocumentsÑ are trademarks of The American Institute of Architects. This draft was produced at 13:48:18 CDT on 08/13/2025 under <br />9 <br />Subscription No.20250116558 which expires on , is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract <br />® <br />Documents Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. <br />User Notes: (640e2aeef442e4498d096839) <br /> <br /> BKV GROUP | A9 <br />Qbhf!314!pg!354 <br /> <br />