<br />§ 3.6.2.4 Interpretations and decisions of the Architect shall be consistent with the intent of, and reasonably inferable from, the
<br />Contract Documents and shall be in writing or in the form of drawings. When making such interpretations and decisions, the
<br />Architect shall endeavor to secure faithful performance by both Owner and Construction Manager, shall not show partiality to
<br />either, and shall not be liable for results of interpretations or decisions rendered in good faith. The ArchitectÓs decisions on
<br />matters relating to aesthetic effect shall be final if consistent with the intent expressed in the Contract Documents.
<br />
<br />§ 3.6.2.5 Unless the Owner and Construction Manager designate another person to serve as an Initial Decision Maker, as that
<br />term is defined in AIA Document A201Î2017, the Architect shall render initial decisions on Claims between the Owner andby
<br />the Construction Manager as provided in the Contract Documents.
<br />
<br />§ 3.6.3 Certificates for Payment to Construction Manager
<br />§ 3.6.3.1 The Architect shall review and certify the amounts due the Construction Manager and shall issue certificates in such
<br />amounts. The ArchitectÓs certification for payment shall constitute a representation to the Owner, based on the ArchitectÓs
<br />evaluation of the Work as provided in Section 3.6.2 and on the data comprising the Construction ManagerÓs Application for
<br />Payment, that, to the best of the ArchitectÓs knowledge, information and belief, the Work has progressed to the point
<br />indicated, the quality of the Work is in accordance with the Contract Documents, and that the Construction Manager is
<br />entitled to payment in the amount certified. The foregoing representations are subject to (1) an evaluation of the Work for
<br />conformance with the Contract Documents upon Substantial Completion, (2) results of subsequent tests and inspections, (3)
<br />correction of minor deviations from the Contract Documents prior to completion, and (4) specific qualifications expressed by
<br />the Architect.
<br />
<br />§ 3.6.3.2 The issuance of a Certificate for Payment shall not be a representation that the Architect has (1) made exhaustive or
<br />continuous on-site inspections to check the quality or quantity of the Work, (2) reviewed construction means, methods,
<br />techniques, sequences or procedures, (3) reviewed copies of requisitions received from Subcontractors and suppliers and other
<br />data requested by the Owner to substantiate the Construction ManagerÓs right to payment, or (4) ascertained how or for what
<br />purpose the Construction Manager has used money previously paid on account of the Contract Sum.
<br />
<br />§ 3.6.3.3 The Architect shall maintain a record of the Applications and Certificates for Payment.
<br />
<br />§ 3.6.4 Submittals
<br />§ 3.6.4.1 The Architect shall review the Construction ManagerÓs submittal schedule and shall not unreasonably delay or
<br />withhold approval of the schedule. The ArchitectÓs action in reviewing submittals shall be taken in accordance with the
<br />approved submittal schedule or, in the absence of an approved submittal schedule, with reasonable promptness while allowing
<br />sufficient time, in the ArchitectÓs professional judgment, to permit adequate review.
<br />
<br />§ 3.6.4.2 The Architect shall review and approve, or take other appropriate action upon, the Construction ManagerÓs submittals
<br />such as Shop Drawings, Product Data and Samples, but only for the limited purpose of checking for conformance with
<br />information given and the design concept expressed in the Contract Documents. Review of such submittals is not for the
<br />purpose of determining the accuracy and completeness of other information such as dimensions, quantities, and installation or
<br />performance of equipment or systems, which are the Construction ManagerÓs responsibility. The ArchitectÓs review shall not
<br />constitute approval of safety precautions or construction means, methods, techniques, sequences or procedures. The
<br />ArchitectÓs approval of a specific item shall not indicate approval of an assembly of which the item is a component.
<br />
<br />§ 3.6.4.3 If the Contract Documents specifically require the Construction Manager to provide professional design services or
<br />certifications by a design professional related to systems, materials, or equipment, the Architect shall specify the appropriate
<br />performance and design criteria that such services must satisfy. The Architect shall review and take appropriate action on
<br />Shop Drawings and other submittals related to the Work designed or certified by the Construction ManagerÓs design
<br />professional, provided the submittals bear such professionalÓs seal and signature when submitted to the Architect. The
<br />ArchitectÓs review shall be for the limited purpose of checking for conformance with information given and the design
<br />concept expressed in the Contract Documents. The Architect shall be entitled to rely upon, and shall not be responsible for,
<br />the adequacy and accuracy of the services, certifications, and approvals performed or provided by such design professionals.
<br />
<br />§ 3.6.4.4 Subject to Section 4.2, the Architect shall review and respond to requests for information about the Contract
<br />Documents. The Architect shall set forth, in the Contract Documents, the requirements for requests for information. Requests
<br />for information shall include, at a minimum, a detailed written statement that indicates the specific Drawings or Specifications
<br />AIA Document B133 Î 2019. Copyright ¨ 2014, and 2019. All rights reserved. ÐThe American Institute of Architects,Ñ ÐAmerican Institute of Architects,Ñ ÐAIA,Ñ the
<br />
<br />AIA Logo, and ÐAIA Contract DocumentsÑ are trademarks of The American Institute of Architects. This draft was produced at 13:48:18 CDT on 08/13/2025 under
<br />12
<br />Subscription No.20250116558 which expires on , is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract
<br />®
<br />Documents Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
<br />User Notes: (640e2aeef442e4498d096839)
<br />
<br />A12 | BKV GROUP
<br />Qbhf!317!pg!354
<br />
<br />
|