My WebLink
|
Help
|
About
|
Sign Out
Home
CCP 09152025
Roseville
>
City Council
>
City Council Meeting Packets
>
2025
>
CCP 09152025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2025 2:48:55 PM
Creation date
10/21/2025 2:48:42 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Meeting Date
9/15/2025
Meeting Type
Work Session
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
243
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />in need of clarification and the nature of the clarification requested. The ArchitectÓs response to such requests shall be made in <br />writing within any time limits agreed upon, or otherwise with reasonable promptness. If appropriate, the Architect shall <br />prepare and issue supplemental Drawings and Specifications in response to the requests for information. <br /> <br />§ 3.6.4.5 The Architect shall maintain a record of submittals and copies of submittals supplied by the Construction Manager in <br />accordance with the requirements of the Contract Documents. <br /> <br />§ 3.6.5 Changes in the Work <br />§ 3.6.5.1 The Architect may order minor changes in the Work that are consistent with the intent of the Contract Documents and <br />do not involve an adjustment in the Contract Sum or an extension of the Contract Time. Subject to Section 4.2, the Architect <br />shall prepare Change Orders and Construction Change Directives for the OwnerÓs approval and execution in accordance with <br />the Contract Documents. <br /> <br />§ 3.6.5.2 The Architect shall maintain records relative to changes in the Work. <br /> <br />§ 3.6.6 Project Completion <br />§ 3.6.6.1 The Architect shall: <br />.1 conduct inspections to determine the date or dates of Substantial Completion and the date of final completion; <br />.2 issue Certificates of Substantial Completion; <br />.3 forward to the Owner, for the OwnerÓs review and records, written warranties and related documents required <br />by the Contract Documents and received from the Construction Manager; and <br />.4 issue a final Certificate for Payment based upon a final inspection indicating that, to the best of the ArchitectÓs <br />knowledge, information, and belief, the Work complies with the requirements of the Contract Documents. <br /> <br />§ 3.6.6.2 The ArchitectÓs inspections shall be conducted with the Owner to (1) check conformance of the Work with the <br />requirements of the Contract Documents and (2) verify the accuracy and completeness of the list submitted by the <br />Construction Manager of Work to be completed or corrected. <br /> <br />§ 3.6.6.3 When Substantial Completion has been achieved, the Architect shall inform the Owner about the balance of the <br />Contract Sum remaining to be paid the Construction Manager, including the amount to be retained from the Contract Sum, if <br />any, for final completion or correction of the Work. <br /> <br />§ 3.6.6.4 The Architect shall forward to the Owner the following information received from the Construction Manager: (1) <br />consent of surety or sureties, if any, to reduction in or partial release of retainage or the making of final payment; (2) <br />affidavits, receipts, releases and waivers of liens, or bonds indemnifying the Owner against liens; and (3) any other <br />documentation required of the Construction Manager under the Contract Documents. <br /> <br />§ 3.6.6.5 Upon request of the Owner, and priorPrior to the expiration of one year from the date of Substantial Completion, the <br />Architect shall, without additional compensation, conduct a meeting with the Owner to review the facility operations and <br />performance. <br /> <br />ARTICLE 4 SUPPLEMENTAL AND ADDITIONAL SERVICES <br />§ 4.1 Supplemental Services <br />§ 4.1.1 The services listed below are not included in Basic Services but may be required for the Project. The Architect shall <br />provide the listed Supplemental Services only if specifically designated in the table below as the ArchitectÓs responsibility, <br />and the Owner shall compensate the Architect as provided in Section 11.2. Unless otherwise specifically addressed in this <br />Agreement, if neither the Owner nor the Architect is designated, the parties agree that the listed Supplemental Service is not <br />being provided for the Project. <br />(Designate the ArchitectÓs Supplemental Services and the OwnerÓs Supplemental Services required for the Project by <br />indicating whether the Architect or Owner shall be responsible for providing the identified Supplemental Service. Insert a <br />description of the Supplemental Services in Section 4.1.2 below or attach the description of services as an exhibit to this <br />Agreement.) <br /> <br />AIA Document B133 Î 2019. Copyright ¨ 2014, and 2019. All rights reserved. ÐThe American Institute of Architects,Ñ ÐAmerican Institute of Architects,Ñ ÐAIA,Ñ the <br /> <br />AIA Logo, and ÐAIA Contract DocumentsÑ are trademarks of The American Institute of Architects. This draft was produced at 13:48:18 CDT on 08/13/2025 under <br />13 <br />Subscription No.20250116558 which expires on , is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract <br />® <br />Documents Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. <br />User Notes: (640e2aeef442e4498d096839) <br /> <br /> BKV GROUP | A13 <br />Qbhf!318!pg!354 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.