Laserfiche WebLink
<br />26 <br />27 <br />28 A summary of the proposal’s cost and hours associated with the work is included in the <br />29 table below. Due to different funding for the project, the cost of the project is split between <br />30 the LPCDS and MOC. As part of the RFP, consultants were required to submit alternative <br />31 pricing to do a higher sustainability design such as B3 design, which is required for state <br />32 bonding projects. There are no requirements for this project, which is why the proposal <br />33 included this as an alternative option. <br />34 <br />35 <br />Page 3 of 6 <br />Qbhf!49!pg!354 <br /> <br />