My WebLink
|
Help
|
About
|
Sign Out
Home
CCP 09152025
Roseville
>
City Council
>
City Council Meeting Packets
>
2025
>
CCP 09152025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2025 2:48:55 PM
Creation date
10/21/2025 2:48:42 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Meeting Date
9/15/2025
Meeting Type
Work Session
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
243
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Architectural & Engineering Services <br /> <br /> Listing of prior project experience (must include similar PM work on Public Works projects) <br /> Quality Control strategies to manage the Consultant team (deliverables, schedule, fee) and manage <br />coordination with the City team and the awarded Construction Manager team. <br /> taƭ ğǝğźƌğĬźƌźƷǤ ğƓķ ĭğƦğĭźƷǤ Ʒƚ ƩĻƒğźƓ ƚƓ ƷŷĻ ƦƩƚƆĻĭt from beginning to end. No personnel substitutions <br />will be allowed by the City of Roseville. Identify the number of other projects the PM will simultaneously <br />be working on, if any. <br /> <br />5.5 Key Personnel <br /> <br />In addition to the Project Manager, the Consultant shall identify key personnel from the full team of design <br />disciplines who will be assigned for the entirety of this project. The specific team members who will actively <br />participate in the project on a day-to-day basis need to be identified and include the following resume <br />information: <br />Design discipline work scope responsibility <br />Educational experience, professional registration(s), professional affiliation(s) <br />Project work experience on similar projects (i.e., Public Works, City of Roseville) <br />Indicate prior project experience working with the proposed Consultant team <br />Capacity to remain on the project from beginning to end. No substitutions allowed. <br /> <br />5.6 Project Experience <br /> <br />The Consultant shall highlight prior project experience within the last 10 years with at least three (3) select <br />exemplary projects referenced in the Project Manager and Key Personnel resumes. The detailed project <br />experience information should include the following at a minimum: <br />Completed project photos <br />Narrative description of the project <br />Overall project budget <br />Year of completion <br />Indicate if the project was delivered via a Construction Management firm. <br />Note: Include a list of at least five (5) References with contact information (phone, email). <br /> <br />5.7 Detailed Work Plan & Schedule <br /> <br />The Consultant shall follow the Scope of Services requirements identified in Section 2 of this RFP to define a <br />detailed work plan and schedule to complete the project on time and in budget. The work plan must identify <br />the full scope of services required for completing the multitude of project phases: <br />Define work scope tasks to be accomplished per project phase per design discipline team. <br />Define the full scope of project deliverables per phase. <br />Define a critical path timeline (Gantt Chart Schedule format) to meet the stated RFP goals. <br /> <br /> <br /> <br /> <br /> <br /> <br />21 <br /> <br />RFP Α MOC & LPCDS, Roseville, MN <br />Qbhf!73!pg!354 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.