My WebLink
|
Help
|
About
|
Sign Out
Home
CCP 09152025
Roseville
>
City Council
>
City Council Meeting Packets
>
2025
>
CCP 09152025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2025 2:48:55 PM
Creation date
10/21/2025 2:48:42 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Meeting Date
9/15/2025
Meeting Type
Work Session
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
243
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12. <br />protection engineering. Does this mean that the consultant team will be responsible <br />protection, sprinkler, and alarm systems for the building including infrastructure, <br />types of sprinkler system, sprinkler heads, and coordination within the building and <br />other trades? Or does this include hydraulic calculations, sprinkler system shop <br />drawings, emergency power and battery backup calculations and alarm shop <br />drawing submittals to be included with the bid package? Typically, shop drawings of <br />sprinkler and alarm systems are provided by installers as shop drawing submittals <br />during construction by the contractor. <br />The consultant team will be responsible for providing design criteria and <br />re pump and storage tank requirements, types of sprinkler <br />system, sprinkler heads, and coordination within the building and other trades. <br />13. <br />voltage engineering. Does this mean that the consultant team will coordinate with <br />various city vendors for such systems as telecommunications, audio, visual, <br />security, POTS, or other low voltage systems to provide the necessary infrastructure <br />on the electrical drawings to support vendor installation of all low voltage systems? <br />Or does this mean that the design team will be responsible to design all <br />telecommunications, audio, visual, security, POTS, or other low voltage systems <br /> <br />The consultant team will coordinate with various city vendors for such systems as <br />telecommunications, audio, visual, security, POTS, or other low voltage systems to <br />provide the necessary infrastructure on the electrical drawings to support vendor <br />installation of all low voltage systems. <br />14. <br />engineer? <br />They must be licensed engineers in the state of Minnesota. <br />15. What hydraulic model deliverable is the city requiring for the stormwater <br />management system? Will HydroCAD be acceptable or is the city looking for <br />another stormwater model, such as XPSWMM? <br />HydroCAD and XPSWMM are both models that are acceptable. <br />Qbhf!84!pg!354 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.