Laserfiche WebLink
12. <br />protection engineering. Does this mean that the consultant team will be responsible <br />protection, sprinkler, and alarm systems for the building including infrastructure, <br />types of sprinkler system, sprinkler heads, and coordination within the building and <br />other trades? Or does this include hydraulic calculations, sprinkler system shop <br />drawings, emergency power and battery backup calculations and alarm shop <br />drawing submittals to be included with the bid package? Typically, shop drawings of <br />sprinkler and alarm systems are provided by installers as shop drawing submittals <br />during construction by the contractor. <br />The consultant team will be responsible for providing design criteria and <br />re pump and storage tank requirements, types of sprinkler <br />system, sprinkler heads, and coordination within the building and other trades. <br />13. <br />voltage engineering. Does this mean that the consultant team will coordinate with <br />various city vendors for such systems as telecommunications, audio, visual, <br />security, POTS, or other low voltage systems to provide the necessary infrastructure <br />on the electrical drawings to support vendor installation of all low voltage systems? <br />Or does this mean that the design team will be responsible to design all <br />telecommunications, audio, visual, security, POTS, or other low voltage systems <br /> <br />The consultant team will coordinate with various city vendors for such systems as <br />telecommunications, audio, visual, security, POTS, or other low voltage systems to <br />provide the necessary infrastructure on the electrical drawings to support vendor <br />installation of all low voltage systems. <br />14. <br />engineer? <br />They must be licensed engineers in the state of Minnesota. <br />15. What hydraulic model deliverable is the city requiring for the stormwater <br />management system? Will HydroCAD be acceptable or is the city looking for <br />another stormwater model, such as XPSWMM? <br />HydroCAD and XPSWMM are both models that are acceptable. <br />Qbhf!84!pg!354 <br /> <br />