Laserfiche WebLink
As detailed in 2.3.A Deliverables, the scope includes the consultant providing Site <br />city parcels. <br />6. Will fees be broke out into 16 sections? Per Section 2.3 for both MOC & LPCDS. <br />--2) if they would <br />like. <br /> <br />7. Which is the desire site layout from the concepts provided? <br />8. <br />As detailed in section 2.3.A, site survey is required in the consultant scope. Section <br />2.3.A has been updated to clarify. <br /> Is all storm water management desired to be underground? <br />The City is open to all forms of stormwater management to meet watershed <br />requirements. It is assumed due to site availability much of the storm water <br />management will need to be underground. <br />10. How detailed of a tree inventory are they looking for and is the tree inventory for the <br />entire site (green polygon on page 202). <br />maintenance facility and from the north edge of the city hall parking lot to Woodhill <br />Drive. The tree inventory shall include location, species and size . <br />11. The only wetland that appears to be present on the site is near Howard Johnson <br />Park. Will this area be impacted? If not, it doesn’t appear like a wetland delineation <br /> <br />No wetland delineation of the site will be required. <br />Qbhf!83!pg!354 <br /> <br />