My WebLink
|
Help
|
About
|
Sign Out
Home
CCP 10132025
Roseville
>
City Council
>
City Council Meeting Packets
>
2025
>
CCP 10132025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2025 4:14:47 PM
Creation date
10/21/2025 4:10:27 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Meeting Date
10/13/2025
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
904
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rd <br />Coordinate all inspections and testing as required by the project and OwnerÓs 3 <br />party testing, building systems, and building envelope commissioning agents. <br />Determine when each CMaR subcontractorÓs work is substantially completed and <br />prepare a list of incomplete work and work which does not conform to the <br />requirements of the construction documents. <br />Develop and implement procedures for orderly completion of punch list items, <br />checkout of utilities, operational systems and equipment and initial startup. <br />Ensure full performance and conformance of all testing, training, and <br />commissioning log(s) resolutions along with B3 closeout requirements (if <br />required) <br />Participate in completing subcontractor items as required by B3. <br />Assist owner in creating documentation related to the B3 construction phase <br />for submission requirements. <br />Prepare a punch list for review by Architect prior to substantial completion. <br />Prepare and deliver approved shop drawings, warranties, as-built drawings, and <br />maintenance manuals; administer closeout of the project. <br />Ensure performance of all warranty obligation, resolution of all claims, and other <br />post construction requirements. <br />Assist Owner in the turnover, move-in and building opening. <br />Cooperate with OwnerÓs construction cost auditor; furnish all requested cost <br />documentation; assist Owner in submittals and data required for tax incentives. <br />Assist Owner in preparing required one-year post-construction submission under <br />Minnesota B3 program. <br />Demonstrate and train OwnerÓs maintenance personnel prior to submitting <br />certificate of contract completion. <br />Actively support and participate in one year warranty walk with Owner and <br />Architect. <br />D.RFQ Information, Qualification Evaluation Overview <br />Questions and Inquiries <br />All questions regarding the content included in this RFQ must be sent in writing via <br />email to the following two individuals from the City of Roseville: <br />Jesse Freihammer, Project Manager. <br />Email: Jesse.Freihammer@cityofroseville.com <br />Sally Ricard, Database Specialist <br />Email: Sally.Ricard@cityofroseville.com <br />Only written questions sent via email will receive a response. Questions are due via <br />email by 4:00 PM on Thursday, August 14, 2025. The City of Roseville reserves the <br />right to disregard any questions that come in late. <br />From the date of release of this RFQ, until a Respondent is selected, and a contract <br />executed, Respondents must not communicate with any of OwnerÓs staff OR RFQ/RFP <br />11 <br />Qbhf!2:3!pg!:15 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.