My WebLink
|
Help
|
About
|
Sign Out
Home
CCP 10132025
Roseville
>
City Council
>
City Council Meeting Packets
>
2025
>
CCP 10132025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2025 4:14:47 PM
Creation date
10/21/2025 4:10:27 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Meeting Date
10/13/2025
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
904
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
for the false statements of any subcontractor with which they do not have a direct <br />contractual relationship. A Prime Contractor and subcontractors shall be responsible for <br />false statements by their first-tier subcontractors with which they have a direct contractual <br />relationship only if they accept the verification of compliance with actual knowledge that it <br />contains a false statement. <br /> <br />F. Responders shall obtain and submit ATTACHMENT D4 with their response. After award of <br />contract the Construction Manager at Risk shall include the same responsible contractor <br />requirements in their subcontract solicitations and submit, to the City, the same <br />certifications for all subcontractors and motor carriers who will work on the project. <br /> <br /> <br />5.3. Special Conditions for the Construction Manager at Risk Contract <br />5.3.1. The following Special Conditions shall supplement and supersede the General Conditions <br />of the Contract, A201, wherever the two are in conflict. <br /> <br />The Construction Manager must comply with all requirements of the funding sources used by <br />this project and separate fees and other costs according to the funding source. <br /> <br />5.3.2. The Following Special Conditions shall supplement and supersede the Standard Form of <br />Agreement Between Owner and Construction Manager, AIA Document A133 -2019 (as <br />amended by the City), wherever the two are in conflict. <br /> <br />The Construction Manager must comply with all requirements of the funding sources used by <br />this project and separate fees and other costs according to the funding source. <br /> <br />6. RFP Response Checklist <br />The Following checklist is intended as a guide for Respondents. Respondent isNOT required <br />to include this checklist with its RFP submittal. <br /> AttachmentDescription <br />AProposal Declaration Acknowledgement <br />BAddenda Acknowledgement <br /> C Required Responses to RFP <br /> C 2 Project Approach and Work Plan <br /> C 3 Cost Estimating <br /> C 4 Scheduling <br /> D Required Forms for Construction Manager at Risk <br /> D1 Workforce and Equal Pay Declaration Page <br /> D2 Tax Identification and Registration Form <br /> D3 E-Verify Certification <br /> D4 Responsible Contractor Compliance Verification <br /> E 1 A201-2017 <br /> E 2 A133-2019 <br />Roseville MOC and LPCDS 17 <br />PW25-01 <br />RS160\\21\\1038443.v3 <br />Qbhf!351!pg!:15 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.