Laserfiche WebLink
Phase to commence prior to completion of the Preconstruction Phase, in which case, both phases will proceed concurrently. <br />The Construction Manager shall identify a representative authorized to act on behalf of the Construction Manager with respect <br />to the Project. <br />§3.1 PreconstructionPhase <br />§3.1.1 ExtentofResponsibility <br />The Construction Manager shall exercise reasonable care in performing its Preconstruction Services. The Owner and Architect <br />shall be entitled to rely on, and shall not be responsible for, the accuracy, completeness, and timeliness of services and <br />information furnished by the Construction Manager. The Construction Manager, however, does not warrant or guarantee <br />estimates and schedules except as may be included as part of the Guaranteed Maximum Price. The Construction Manager <br />shall complete comprehensive estimates at the60% and 100% Construction Document phases of design.The Construction <br />Manager is not required to ascertain that the Drawings and Specifications are in accordance with applicable laws, statutes, <br />ordinances, codes, rules and regulations, or lawful orders of public authorities, but the Construction Manager shall promptly <br />report to the Architect and Owner any nonconformity discovered by or made known to the Construction Manager as a request <br />for information in such form as the Architect may require. <br />§3.1.2 The Construction Manager shall provide a preliminary evaluation of the Owner’s program, schedule and construction <br />budget requirements, each in terms of the other. <br />§3.1.3 Consultation <br />§3.1.3.1 The Construction Manager shall schedule and conduct meetings with the Architect and Owner to discuss such matters <br />as procedures, progress, coordination, and scheduling of the Work. <br />§3.1.3.2 The Construction Manager shall advise the Owner and Architect on proposed site use and improvements, selection of <br />materials, building systems, and equipment. The Construction Manager shall also provide recommendations to the Owner and <br />Architect, consistent with the Project requirements, on constructability; availability of materials and labor; time requirements <br />for procurement, installation and construction; prefabrication; and factors related to construction cost including, but not <br />limited to, costs of alternative designs or materials, preliminary budgets, life-cycle data, and possible cost reductions(“Value <br />Engineering”). The Owner acknowledges that such Value Engineering services are advisory and are not professional design <br />services, and that in many instances the opportunity to reduce costs by using alternate or different materials, equipment or <br />methods may come with corresponding tradeoffs in quality, performance, aesthetics, maintenance, or operations.The Owner <br />shall have the obligation to ensure that any Value Engineering cost savings proposals are independently evaluated by the <br />Architect and other members of the Owner’s design team to determine whether the potential cost saving opportunities are <br />acceptable for incorporation or use in the Work. Such Value Engineering services shall be considered a part of <br />Preconstruction Services whether performed before or after commencement of the Construction Phase. The Construction <br />Manager shall consult with the Architect regarding Value Engineeringservices to be provided by the Construction Manager <br />during the Construction Phase. <br />§3.1.3.3 The Construction Manager shall assist the Owner and Architect in establishing written protocols for the development, <br />use, transmission, reliance, and exchange of digital data, including building information models for the Project. <br />§3.1.4 ProjectSchedule <br />When Project requirements have been sufficiently identified, the Construction Manager shall prepare and periodically update <br />asagreed to by Owner and Construction Manager, a Project schedule for the Architect’s review and the Owner’s acceptance. <br />The Construction Manager shall obtain the Architect’s approval for the portion of the Project schedule relating to the <br />performance of the Architect’s services. The Project schedule shall coordinate and integrate the Construction Manager’s <br />services, the Architect’s services, other Owner consultants’ services, and the Owner’s responsibilities; and identify items that <br />affect the Project’s timely completion. The updated Project schedule shall include the following: submission of the <br />Guaranteed Maximum Price proposal; components of the Work; times of commencement and completion required of each <br />Subcontractor; ordering and delivery of products, including those that must be ordered in advance of construction; and the <br />occupancy requirements of the Owner. <br />§3.1.5 PhasedConstruction <br />The Construction Manager, in consultation with the Architect, shall provide recommendations with regard to accelerated or <br />fast-track scheduling, procurement, and sequencing for phased construction. The Construction Manager shall take into <br />consideration cost reductions, cost information, constructability, provisions for temporary facilities, and procurement and <br />AIA Document A133 –2019. Copyright © 1991, 2003, 2009, and 2019. All rights reserved. “The American Institute of Architects,” “American Institute of <br />Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects.This draft was produced at 13:53:13 CDT <br />6 <br />on 08/18/2025 under Subscription No.20250116558 which expires on , is not for resale, is licensed for one-time use only, and may only be used in accordance <br />® <br />with the AIA Contract DocumentsTerms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. <br />User Notes: (640e2aedf442e4498d096805) <br />Qbhf!248!pg!74: <br /> <br />