My WebLink
|
Help
|
About
|
Sign Out
Home
CCP 11102025
Roseville
>
City Council
>
City Council Meeting Packets
>
2025
>
CCP 11102025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2025 10:42:01 AM
Creation date
11/13/2025 10:41:14 AM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Meeting Date
11/10/2025
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
639
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
construction scheduling issues. <br />§3.1.6 CostEstimates <br />§3.1.6.1 Based on the preliminary design and other design criteria prepared by the Architect, the Construction Manager shall <br />prepare, for the Architect’s review and the Owner’s approval, preliminary estimates of the Cost of the Work or the cost of <br />program requirements using area, volume, or similar conceptual estimating techniques. If the Architect or Construction <br />Manager suggests alternative materials and systems, the Construction Manager shall provide cost evaluations of those <br />alternative materials and systems. <br />§3.1.6.2 As the Architect progresses with the preparation of the Schematic Design, Design Development and Construction <br />Documents, the Construction Manager shall prepare and update, at 60% and 100%Construction documentsand at other <br />appropriate intervals agreed to by the Owner, Construction Manager and Architect, an estimate of the Cost of the Work with <br />increasing detail and refinement. The Construction Manager shall include in the estimate those costs to allow for the further <br />development of the design, price escalation, and market conditions,until such time as the Owner and Construction Manager <br />agree on a Guaranteed Maximum Price for the Work. The estimate shall be provided for the Architect’s review and the <br />Owner’s approval. The Construction Manager shall inform the Owner and Architect in the event that the estimate of the Cost <br />of the Work exceeds the latest approved Project budget, and make recommendations for corrective action. <br />§3.1.6.3 If the Architect is providing cost estimating services as a Supplemental Service, and a discrepancy exists between the <br />Construction Manager’s cost estimates and the Architect’s cost estimates, the Construction Manager and the Architect shall <br />work togetherto reconcile the cost estimates. <br />§3.1.7 As the Architect progresses with the preparation of the Schematic Design, Design Development and Construction <br />Documents, the Construction Manager shall consult with the Owner and Architect and make recommendations regarding <br />constructability and schedules,for the Architect’s review and the Owner’s approval. <br />§3.1.8 The Construction Manager shall provide recommendations and information to the Owner and Architect regarding <br />equipment, materials, services, and temporary Project facilities. <br />§3.1.9 The Construction Manager shall provide a staffing plan for Preconstruction Phase services for the Owner’s review and <br />approval. <br />§3.1.10 If the Owner identified a Sustainable Objective in Article 1, the Construction Manager shall fulfill its Preconstruction <br />Phase responsibilitiesin accordance withthe agreed-upon terms, conditions and services related to the Owner’s Sustainable <br />Objective. <br />§3.1.11 SubcontractorsandSuppliers <br />§3.1.11.1 If the Owner has provided requirements for subcontractor procurement in section 1.1.14, the Construction Manager <br />shall provide a subcontracting plan, addressing the Owner’s requirements, for the Owner’s review and approval. <br />§3.1.11.2 The Construction Manager shall develop bidders’ interest in the Project, in accordance with Minnesota Statutes <br />Section 471.463, subd. 5(b). <br />§3.1.11.3 The processes described in Article 9 shall apply if bid packages will be issued during the Preconstruction Phase. <br />§3.1.12 Procurement <br />The Construction Manager shall prepare, for the Architect’s review and the Owner’s acceptance, a procurement schedule for <br />items that must be ordered in advance of construction. The Construction Manager shall expedite and coordinate the ordering <br />and delivery of materials that must be ordered in advance of construction. If the Owner agrees to procure any items prior to <br />the establishment of the Guaranteed Maximum Price, the Owner shall procure the items on terms and conditions acceptable to <br />the Construction Manager. Upon the establishment of the Guaranteed Maximum Price, the Owner shall assign all contracts for <br />these items to the Construction Manager and the Construction Manager shall thereafter accept responsibility for them. <br />AIA Document A133 –2019. Copyright © 1991, 2003, 2009, and 2019. All rights reserved. “The American Institute of Architects,” “American Institute of <br />Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects.This draft was produced at 13:53:13 CDT <br />7 <br />on 08/18/2025 under Subscription No.20250116558 which expires on , is not for resale, is licensed for one-time use only, and may only be used in accordance <br />® <br />with the AIA Contract DocumentsTerms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. <br />User Notes: (640e2aedf442e4498d096805) <br />Qbhf!249!pg!74: <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.