My WebLink
|
Help
|
About
|
Sign Out
Home
CCP 11102025
Roseville
>
City Council
>
City Council Meeting Packets
>
2025
>
CCP 11102025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2025 10:42:01 AM
Creation date
11/13/2025 10:41:14 AM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Meeting Date
11/10/2025
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
639
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
§ 11.1.6 Applications for Payment shall show the percentage of completion of each portion of the Work as of the end of the <br />period covered by the Application for Payment. The percentage of completion shall be the lesser of (1) the percentage of that <br />portion of the Work which has actually been completed, or (2) the percentage obtained by dividing (a) the expense that has <br />actually been incurred by the Construction Manager on account of that portion of the Work and for which the Construction <br />Manager has made payment or intends to make payment prior to the next Application for Payment, by (b) the share of the <br />Guaranteed Maximum Price allocated to that portion of the Work in the schedule of values. <br />§ 11.1.7 In accordance with AIA Document A201–2017, as modified,andsubject to other provisions of the Contract <br />Documents, the amount of each progress payment shall be computed as follows: <br />§ 11.1.7.1 The amount of each progress payment shall first include: <br />.1 That portion of the Guaranteed Maximum Price properly allocable to completed Work as determined by <br />multiplying the percentage of completion of each portion of the Work by the share of the Guaranteed <br />Maximum Price allocated to that portion of the Workin the most recent schedule of values; <br />.2 That portion of the Guaranteed Maximum Price properly allocable to materials and equipment delivered and <br />suitably stored at the site for subsequent incorporation in the completed construction or, if approved in writing <br />in advance by the Owner, suitably stored off the site at a location agreed upon in writing; <br />.3 That portion of Construction Change Directives that the Architect determines, in the Architect’s professional <br />judgment, to be reasonably justified; and <br />.4 The Construction Manager’s Fee, computed upon the Cost of the Work described in the preceding Sections <br />11.1.7.1.1 and 11.1.7.1.2 at the rate stated in Section 6.1.2 or, if the Construction Manager’s Fee is stated as a <br />fixed sum in that Section, an amount that bears the same ratio to that fixed-sum fee as the Cost of the Work <br />included in Sections 11.1.7.1.1 and 11.1.7.1.2 bears to a reasonable estimate of the probable Cost of the Work <br />upon its completion. <br />§ 11.1.7.2 The amount of each progress payment shall then be reduced by: <br />.1 The aggregate of any amounts previously paid by the Owner; <br />.2 The amount, if any, for Work that remains uncorrected and for which the Architect has previously withheld a <br />Certificate for Payment as provided in Article 9 of AIA Document A201–2017; <br />.3 Any amount for which the Construction Manager does not intend to pay a Subcontractor or material supplier, <br />unless the Work has been performed by others the Construction Manager intends to pay; <br />.4 For Work performed or defects discovered since the last payment application, any amount for which the <br />Architect may withhold payment, or nullify a Certificate of Payment in whole or in part, as provided in Article <br />9 of AIA Document A201–2017; <br />.5 The shortfall, if any, indicated by the Construction Manager in the documentation required by Section 11.1.4 to <br />substantiate prior Applications for Payment, or resulting from errors subsequently discovered by the Owner’s <br />auditors in such documentation; and <br />.6 Retainage withheld pursuant to Section 11.1.8. <br />§ 11.1.8 Retainage <br />§ 11.1.8.1 For each progress payment made prior to Substantial Completion of the Work, the Owner may withhold the <br />following amount, as retainage, from the payment otherwise due: <br />(Insert a percentage or amount to be withheld as retainage from each Application for Payment. The amount of retainage may <br />be limited by governing law.) <br />Owner shall withhold five percent (5%) of the amount approved for payment in each payment period. <br />§ 11.1.8.1.1 The following items are not subject to retainage: <br />(Insert any items not subject to the withholding of retainage, such as general conditions, insurance, etc.) <br /> <br />§ 11.1.8.2 Reduction or limitation of retainage, if any, shall be as follows: <br />(If the retainage established in Section 11.1.8.1 is to be modified prior to Substantial Completion of the entire Work, insert <br />provisions for such modification.) <br />AIA Document A133 – 2019. Copyright © 1991, 2003, 2009, and 2019. All rights reserved. “The American Institute of Architects,” “American Institute of <br />Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects.This draft was produced at 13:53:13 CDT <br />18 <br />on 08/18/2025 under Subscription No.20250116558 which expires on , is not for resale, is licensed for one-time use only, and may only be used in accordance <br />® <br />with the AIA Contract DocumentsTerms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. <br />User Notes: (640e2aedf442e4498d096805) <br />Qbhf!25:!pg!74: <br /> <br />